Hydraulic Transient Analysis of High-Head Hydropower Project
An iterative computer simulation procedure called LIQT (Liquid Transient), which performs simulations of hydraulic transients in closed conduit hydro-power systems, is used to estimate...

The Colorado River Simulation System
The Colorado River Simulation System (CRSS) is a comprehensive computer tool designed to assist water resource managers in long-range planning and management of the Colorado River Basin....

Design and Operation of Guard Gates
Guard gates for hydroelectric intakes and low-level outlets are normally intended for operation only under balanced heads. In the case of failure of regulating gates, the guard gate may...

The Estimation of Extreme Floods in Brazil
In Brazil, the design flood of a large dam is calculated using either the Probable Maximum Flood criteria or the 10,000-year Flood. Recently a Guidebook has been written to help Brazilian...

Climate Change and U.S. Water Resources: Results from a Study by the American Association for Advancement of Science
The time horizon of the changes that might occur is similar to the time required for planning, approval, funding, construction and economic life of such major water facilities as dams,...

Optimal Interpolation of Bathymetry in the Thyrrehnian Sea
The bathymetry of the Tyrrhenian Sea in the area facing the electro-nuclear plant being built at Montalto di Castro, Italy, is reconstructed with the aid of the constrained kriging making...

Jet Injection Model Studies for the City of Los Angeles
The Hypersion Treatment Plant for the City of Los Angeles is currently undergoing an expansion project. A major component of this system is a sludge recycling system. And it is essential...

Underwater Tunnel Inspection by Virginia Power Using a Submersible Robot
The Bath County Pumped Storage Station, has three large tunnels linking the upper and lower reservoirs. The 'Hydrover' submersible remotely operated vehicle (ROV)...

Far-Field Numerical Model Studies for Boston's New Secondary Treatment Plant Outfall Siting
By the late 1900s, Boston is scheduled to have built a new secondary treatment plant that combines the waste streams from two existing plant, and discharges the resulting liquid effluent...

Hydraulic Design Aspects of the Boston Outfall
The diffuser outfall under design for Boston must have the ability to be purged of seawater upon commissioning or following an accidental flow stoppage. The criteria governing the flushing...

Glacial Basin Flow for a Power Operation Model
A power operation model was developed and used to estimate the project energy generation and reservoir level fluctuations. In order to precisely simulate the daily project operation, daily...

Localized Mixing for Improvement of Hydropower Releases from J. Percy Priest Reservoir
The J. Percy Priest Project, located on the Stones River near Nashville, TN, experienced low dissolved oxygen (DO) in the tailwaters during hydropower generation. Using commercially available...

Debris Torrents in Nepal and Use of Reliability Engineering Concepts During Redesign of River Works
Debris torrents, generated by cloudbursts and by glacier lake outbursts, occur frequently in the Nepal Himalaya. A simple fault tree analysis is applied to the destruction of a diversion...

Siting the New Boston Outfall: Near-Field Considerations
This paper describes a procedure applied in near-field considerations for siting the new outfall to serve the Massachusetts Water Resources Authority's (MWRA) proposed regional...

The Hydro Business: 1990 and Beyond
During the last ten years, hydroelectric generation received more and more attention as a source of reliable and economical electricity. Since the first WATERPOWER conference, the industry...

Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...

The Development and Writing of the ASCE/EPRI Hydroelectric Guidelines
In the Spring of 1989, the American Society of Civil Engineers (ASCE) and the Electric Power Research Institute (EPRI) jointly published their Civil Engineering Guidelines for Planning...

Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...

Hydropower Development under the Utility Concept of Least Cost Utility Planning
The impetus behind 'Least Cost Utility Planning' (LCUP) is that if new generation or purchased power could be deferred, the resultant savings could be used to...

Determining Hydro Project Dependable Capacity
Traditional techniques for estimating a hydro project's dependable capacity are of limited value when evaluating a hydro project in a thermal-based power system. For such...

 

 

 

 