Research to Application: Network Models to Simulate Flow and Transport in Heterogeneous Media
Effective groundwater cleanup requires accurate site-specific information on cleanup processes. Numerical simulations limit the need for expensive field experiments and provide details...
Development of Remediation Technologies Simulators
This paper summarizes on.going efforts to develop software for simulating various in situ, subsurface remediation technologies to improve remediation selection, design, and operation....
Design Guidance?Instream and Bank Restoration Structures
Despite an urgent need for river and stream restoration design criteria, little guidance has emerged in recent years. Existing guidance is largely unsatisfactory, promoting empiricism...
Controlling the Impacts of Development on Storm Water Quality through Proper Site Planning and Design
Land development and construction activities can significantly alter drainage patterns, increase runoff peak flow and volume, and contribute pollutants to storm water runoff. Federal and...
Use of Geomorphic Data for Assessing Stream Stability at Bridge Structures
The authors recently completed a statewide bridge scour evaluation for the Nevada Department of Transportation, which included evaluation of the geomorphic processes of bank erosion and...
Channel Restoration Project along Toby Creek
Creek banks within Mecklenburg County, NC, are eroding, producing excessive quantities of sediment in the creek and causing bank instability. Seeking innovative approaches to these problems,...
The Use of Hydrologic Budget Techniques in Assessing Site Suitability for Wetland Creation
This paper discusses the general concepts and benefits of using of hydrologic budget techniques to describe the typical hydrologic conditions that might be expected at prospective site...
Sediment Erosion Rate in the Baltimore Harbor
In-situ erosion experiments were conducted at four selected sites in the Baltimore harbor in May 1995 using the VIMS Sea Carousel. The measurements showed that the erosion rate decreased...
Accessible Information
As the amount of data relating to U.S. environmental policy grows, geographic information systems and advanced visualization system technology are being applied extensively to site investigations...
Rock Foundations
This manual provides technical criteria and guidance for the design of rock foundations for civil works or other similar large military structures. It provides a minimal standard to be...
Monitor Well Design, Installation, and Documentation at Hazardous and/or Toxic Waste Sites
This manual provides the minimum elements for consideration in the design, installation, and documentation of monitor well placement at projects known or suspected to contain chemically...
Waste Not in Wisconsin
Nationwide, local public works departments wrestle with the problem and costs of cleaning up abandoned landfill sites. Often, municipalities acquire property through tax foreclosures or...
Building a Landfill on Mud(Available only in Geo/Environmental Special Issue)
In the early 1980s, officials at the Delaware Solid Waste Authority (DSWA) thought they had found the ideal site for a new municipal landfill: low acquisition cost, direct access from...
Bad Vibrations
Insurance companies often hire engineers to investigate homeowner claims of damage caused by vibrations near a blast or construction site. But these engineers often lack the background...
Sound Way to Save Fish
Fish protection need not cost an arm and a fin. Using light and sound to spare fragile blueback herring and other species a harrowing fate, the U.S. Army Corps of Engineers devised a fish...
Non-Aqueous Phase Liquids (NAPLs) in Subsurface Environment
Assessment and Remediation
The growing number of incidents of soil and groundwater contamination with non-aqueous phase liquids (NAPLs) has caught the nation unprepared. A number of challenges confronted the three...
Boston Blockbuster
The Central Artery/Tunnel project in Boston is probably the single largest publicly-funded transportation project in the country at present. The total cost will be between $8 and $10 billion...
Starting a Project
Project start-up marks the end of the planning activities and the beginning of the project. The PM must take the steps necessary to set up job numbers, job data sheets, assemble data needed...
Insurance and the Environmental Engineer
The grading/excavation contractor had no problem completing the project, a routine regrading job with no visible problems or obstructions at the site, on time and on budget. Two years...
The Magnificent 17
Only two of 1995's record 19 nominees could win the 1995 Outstanding Civil Engineering Achievement Award and the Award of Merit, but the 17 remaining nominees are noteworthy...