Quality in the Constructed Project: A Workshop Report
In the fall of 1984, ASCE conducted a workshop to determine what actions are necessary to improve quality in the constructed project. The engineering segment of the two-day meeting included...

Quality Management in the US Army Corps of Engineers: An Evaluation
Quality management programs are employed to assure the achievement of specific standards of performance. In the construction industry, quality management personnel face common problems...

The Role of the Quality Assurance Management on a Large Commercial Project
The role of the quality assurance manager on a high rise project being built on a tight time schedule is a challenging and diversified assignment. It is made especially difficult when...

Managing Quality into the Workplace
In February, 1983, the author's organization began a process designed to enhance attitudes about quality in every individual member of the organization. The process requires...

Abutment Seepage at Smithville Dam
After initial filling there was concern for the stability of Smithville Dam when higher than anticipated piezometric levels were experienced in the left abutment foundation. Concern heightened...

Computer-Assisted Grouting Evaluation Systems
Electronic monitoring of cement pressure grouting at Ridgway Dam provides a powerful tool for geologic assessment of drilling and grouting results. Graphic surveillance and analysis of...

Site Selection and Building Design for Minimizing Vibration
Over the last five to ten years, line resolutions required for state-of-the-art semi-conductor wafers have dropped to well below 1 micron. As a result, controlling environmental building...

Challenges to Civil Engineering Educators and Practitioners?Where Should We Be Going?
The papers included in this publication present an overview of the current state of civil engineering education and resolutions for future development in the field. Six key areas are covered:...

Civil Engineering in the Arctic Offshore
The 123 papers included in this publication describe the present state of practice, consider emerging concepts and requirements, define research and development needs and critique present...

Construction QA/QC Systems that Work
Case Studies
Four case studies discuss the issue of responsibility for quality assurance and quality control by describing actual situations where quality work is being done in the field. The case...

Quality in the Constructed Project
The purpose of the workshop summarized in this book was to develop an agenda for ASCE actions to promote quality in the constructed project. The papers, discussions and session reports...

Water Information Available from the U.S. Geological Survey
As a part of the Geological Survey's program of releasing water data to the public, two large-scale computerized systems are maintained. The National Water Data Storage and...

Computer Applications for Real-Time Operation of Water Distribution Systems
This paper surveys the state-of-the-art in computer assisted real-time operation of water distribution systems. It first examines the reasons and justification for installing computer...

Real-Time Control of Water Resource Systems
Successes in industry and manufacturing and preliminary experiences in the water resources field have documented the productivity and performance benefits obtainable with application of...

Real Time Control of Combined Sewers
After an introduction on the scope of urban drainage and water pollution control problems static solution approaches are shortly described and their disadvantages are lined out. The potential...

Yakima Supervisory Real-Time Monitoring and Control System
The Yakima Remote Control System is a case study application of supervisory control and data acquisition (SCADA) concepts for the operation and monitoring of a large water resources project....

Computers: Water Resources Models in Latin America
Ninety-six national institutions dealing with planning, irrigation, water supply, and hydropower generation in twenty-six Latin American and Caribbean countries were surveyed between February...

Computerized Operation of California State Water Project
Hydraulic and electrical schedules for the California State Water Project are determined and dispatched from the Project Operation Control Center (POCC) in Sacramento. The dispatched schedules...

Real-Time Reservoir Operations by Quadratic Programming
A quadratic programming model is developed for real-time reservoir operations. It is assumed that convex penalty functions that relates the deviations of storage levels and downstream...

A Post-Audit of the Potomac Eutrophication Model
An unusual, unexpected, and unpredicted event - the Potomac Algae Bloom of 1983 - prompted a post-audit examination of the primary tool being used for guiding the continuing development...

 

 

 

 

Return to search