Autothermal Thermophilic Aerobic Digestion: A Two-Year Appraisal of Canadian Facilities
Full scale, autothermal thermophilic aerobic digestion (ATAD) facilities were constructed or upgraded in 1988 to demonstrate high temperature aerobic digestion of municipal sludges at...

Anoxic-Aerobic Activated Sludge Treatment
An activated sludge system was operated at a relatively low SRT of 1-2 days at the City of Phoenix to meet secondary treatment requirements. Operating MLSS concentrations were 400-600...

Aerobic Denitrification in Activated Sludge
Definitive proof of the phenomenon of concurrent biological nitrification-denitrification in activated sludge is presented. The mechanism appears to be an inhibition of oxygen respiration...

Effects of Temperature and Mean Cell Residence Time on Enhanced Biological Phosphorus Removal
The effects of temperature and mean cell residence time (MCRT) on biological phosphorus and nitrogen removal were investigated by operating pilot-scale continuous-flow activated sludge...

The Effect of Operational Parameters on the Acid-phase Anaerobic Fermentation in the Biological Phosphorus Removal Process
A series of laboratory-scale, continuous flow experiments has been employed to study the effects of selected HRTs and SRTs on the acid-phase fermentation of primary sludge. The VFA production...

Minimization of Hazardous Waste Generation: Preliminary Investigation of Waste Management Properties of a Solvent Substitute for TCE
The objective of this study was to conduct a preliminary evaluation of waste management properties of a terpene-based solvent substitute. Waste management properties which were evaluated...

Hazardous Waste Reduction?An International Perspective
Waste reduction has long been recognized as the preferred option for the management of hazardous wastes. As early as 1976, the United States Environmental Protection Agency (EPA) adopted...

Complete Recyling in the Organics Chemicals Industry
Regulations for both direct and indirect discharges have become so stringent in order to protect the environment that wastewater treatment and effluent levels in the organics chemicals...

Waste Minimization/Reduction Initiatives and Consequences
This paper summarizes the various waste minimization and waste reduction initiatives being implemented nationwide. Areas of evaluation include: Material Substitution, Production Modification,...

Case Studies of POTW Air Toxic Emission Tests and a Proposed Emission Control Strategy
Air toxic emissions and associated human health risk at wastewater treatment plants can be reduced with a phased implementation strategy. An evaluation of major conventional secondary...

Influence of Moisture Influx on the Hygro-thermal Performance of a Clay Buffer Developed for Nuclear Disposal Vault
This paper focusses on an experimental study that investigates the heat transfer and moisture movement within a bentonite clay buffer compacted in a borehole located in a granite block....

Composite Liner, Leak Detection System, and Floating Cover for Nuclear Reactor Emergency Retention Basins
Existing reactor effluent basins are being retrofitted with composite liners, leak detection system and floating covers. Such basins have a 15-year life and remain empty until an accident...

Slurry Bioremediation of Petrochemical Waste Sludges
Slurry bioremediation testing was conducted on waste sludges from petrochemical production. The study concludes that the apparent mechanism for remediation of the waste involves an initial...

Substrate Effects on Methanotrophic Trichloroethylene Degradation
Formate up to 1g/L had no significant enhancing effect on the degradation of trichloroethylene (TCE) by three mixed enrichments of methane-oxidizing bacteria. Methanol did not enhance...

Removal of Priority Pollutants in Industrial and Hazardous Wastewaters
With the implementation of effluent standards based on water quality criteria, more and more situations arise where the capabilities of treatment technology is stretched to their limits...

Redevelopment of Remediated Superfund Sites: Problems with Current Approaches in Providing Long-Term Public Health Protection
The normal primary objective of Superfund site remediation is the control of hazardous chemicals so that they do not represent a significant threat to public health and the environment...

Development of Effective Remediation Criteria
Clean-up criteria for remediation of hazardous waste sites take several forms. These vary from simple sensory parameters, e.g., visual evidence of contamination to specific numerical criteria...

Performance Analysis of Remedial Alternatives
This paper demonstrates how remedial action alternatives for a Superfund site can be evaluated using a health-risk basis. The case history for this demonstration is a Feasibility Study...

Construction Management at Sikes Superfund Site
Lockwood, Andrews & Newnam, Inc. (LAN) is providing Construction Management services on the Sikes Superfund site. The project involves constructing an incinerator on-site and incinerating...

The Observational Approach in Environmental Restoration
The U.S. Department of Energy (DOE) has committed to completing environmental restoration of its facilities within the next 28 years (DOE 1990). To achieve this, DOE must ensure that its...

 

 

 

 

Return to search