Petroleum Development in Louisiana's Coastal Zone
The most intense petroleum development activity in the nation's coastal area has been concentrated in Louisiana. Most of Louisiana's production has occurred in...
Splitting Common-Pool Offshore Oil & Gas Revenues
The Department of Interior (DOI) and several coastal states are currently at odds over an issue with enormous financial stakes as well as far-reaching implications in federal/state relations....
Permitting for Oil and Gas Activities in the OCS Mukluk Island?Beaufort Sea, Alaska 1983
In Alaska so little land is in private ownership that the primary means for the oil industry to obtain rights for exploration and development is through State or Federal petroleum lease...
Coastal and Ocean Resources for Energy Development
There has been a growing interest in renewable alternative sources of energy. An increasing effort is being directed towards the problem of extracting energy from the world's...
Fisheries Planning for Northern Territory, Australia
On behalf of Northern Territory Government the consultants have studied the potential for development and reviewed the present infrastructure. Opportunities as well as constraints to development...
Geologic Review: A Successful Procedure for the Minimization of the Impact of Oil and Gas Exploration and Production on Louisiana Wetlands
An effective procedure to minimize the amount of wetlands impacted by oil and gas well access routes has been developed. The procedure consists of a stringent geologic review of every...
Helms Pumped Storage Project
The powerhouse at California's Helms Pumped Storage Project is 1,200 ft below the surface of the Sierra Nevada mountains. Linking existing reservoirs, the project provides...
Bath County Pumped Storage
The Bath County Hydroelectric Pumped Storage Project provides 2,100 Mw of peak power to Virginia Electric & Power Co. and Allegheny Power Co. Called a bargain at $1.6 billion,...
Energy Dissipation in Tidal Waterways
Energy dissipation in tidal waterways is estimated analytically by a harmonic method. Calibration of harmonic parameters is done through numerical simulation. Relations between tidal energy...
Lessons Learned from First Impulse Turbine Installation in the U.S. Mining Industry
The paper discusses a research study to recover energy from service or cooling water brought into deep mines. The test site was the Luck Friday Mine, owned and operated by the Hecla Mining...
Hydro Power Intake Design?Criteria and Experience
This paper briefly addresses parameters to be considered in hydro power intake designs. Included are design approaches and criteria, specific examples, and applicable references. Concerns...
Unique Utilization of a Physical Model to Develop a Construction Sequence of a Major Cofferdam
Lock and Dam 26 Replacement is being constructed on the Mississippi River about 2 miles downstream of the existing Locks and Dam No. 26 at Alton, Illinois. This paper discusses the unique...
Guideway and Conductor Rail Heating for a Winter Environment
The power and signal conducting rails are maintained using self-limiting heat trace cable in combination with an inherently protected rail. The cable's high inrush power along...
Emerging Technology?A Solution to Airport Access Problems
This paper reviews airports which presently have employed people movers, the problems they are solving, and potential use for solving access problems and create added value for the investment...
Insulative Lightweight Concrete for Building Walls
Research is currently being conducted to develop a portland cement concrete for use in low-rise building walls that will combine the structural, thermal insulating, and heat storage capacity...
Simulating Construction Operations by Microcomputer
Field operations on major construction projects involve complex interactions among construction equipment, materials and supplies, skilled craft resources, and technical and administrative...
Inspection Costs Versus the Benefits Derived
The following text describes the experiences of a small suburban municipality located in Middle Tennessee before, during and after a five-year program of comprehensive inspection and testing...
Energy Forecasting Techniques: An Overview
This paper provides an overview of the primary forecasting techniques employed by electric and natural gas utilities to predict energy consumption and demand. Although the techniques discussed...
Design, Construction & Performance of Fades Dam
The project, construction and performance of les Fades dam are described. Les Fades dam is one of the first concrete faced rockfill dams compacted with a vibratory roller. A vibratory...
Alto Anchicaya Dam?Ten Years Performance
The general aspects of design and construction of the Alto Anchicaya Dam duilt during 1970 - 1974 in Colombia, South America are described. The paper refers to the performance of the structure...
Return to search