Risk Analysis for Ship-Bridge Collisions
The authors have developed a propriety software package which has been successfully used to perform risk analyses for several high-level bridge structures across major waterways in coastal...

Coping with Litigation
Engineers should learn legal philosophy, even though it seems unrelated to traditional technical practice. Monitoring changes in legal theory that may increase engineers'...

Floating Bridge for 100 Year Storm
In 1979 the west half of the Hood Canal Floating Bridge, built in 1960, in Seattle broke up and sank during a storm that lasted eight hours with winds of 80 mph and gusts over 100 mph....

Record Bridge Replacement
Jacks Run Bridge had to be rebuilt in one year instead of the usual two to three. So the Pennsylvania Department of Transportation spearheaded the quickest replacement of a major bridge...

Bridging Twin Ports
The Major Richard I. Bong Memorial Bridge, part of U. S. Highway 2, connects harbors at Duluth, Minn. and Superior, Wisc. The new highway link was designed to relieve congestion on nearby...

Who Should Design Bridges?
For many years Design-Build-Proposals have been common practice in Europe (except in the UK). Structures in these countries are 20% more economical than similar projects in the U. S.,...

The Impact of the I-664 Bridge-Tunnel Crossing on Sedimentation
A sedimentation evaluation was made of the proposed I-664 Bridge-Tunnel complex across the James River, Virginia. This paper briefly describes the procedures used and the results obtained...

Investigation of Design Criteria for APM Guideways
Designers have relied mostly on the provisions of the American Association of State Highway and Transportation Officials (AASHTO) Standard Specifications for Highway Bridges. Sometimes...

Nine Years' Service with Deep Polymer Impregnation
A test installation of deep polymer impregnation was applied to a heavily traveled bridge deck in Bethlehem, Pennsylvania, in 1975. The deep polymer impregnation process involved drying...

Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...

Clearing the Decks
Cathodic protection, an electrical-chemical process that prevents corrosion of steel rebars on bridge decks, is rapidly gaining acceptance by highway engineers and state highway departments....

New Cables for Old
In an eingineering first, the main suspension cables will be replaced on New York City's Williamsburg Bridge without closing it to traffic at any time. According to the design...

Applications of Microcomputers for Bridge Design
This paper examines the role of microcomputers in the design divisions of state departments of transportation, specifically in bridge design applications. Consideration is given primarily...

Tunneling a Bridge
Linking an addition to the Georgia World Congress Center in Atlanta required a pedestrian tunnel through a railroad embankment 100 ft wide and 40 ft high, with no disruption of train service...

Advances in Short Span Steel Bridges
Applying recent research to the design of short span steel bridges can lower their cost and maintenance. Such research involves improved limit state criteria, more uniform lateral load...

Jointless Bridge Decks
Deck joints in a bridge are the source of many problems over its lifetime. In time, chances are good the joint will leak, permitting water and salt to leak through. Often this leads to...

Redecking with Precast Keeps Traffic Moving
The Woodrow Wilson Memorial Bridge in Washington, D.C. could not be closed to traffic while a new deck was constructed. The engineers designed a precast prestressed and post-tensioned...

Rail and Road Traffic Continue During Bridge Modification
The crossing of Route 15 under the Bangor and Aroostook Railroad Bridge, Bangor, Maine had limited sight distance and marginal clearances. Maine Department of Transportation, therefore,...

Steel Girder Bridge Sets Record Length
The Veterans Memorial Bridge at Ottawa, Ill., is the longest plate girder, stringer type bridge in the country with spans of 385, 510 and 305 ft. Value engineering played an important...

The Case of the Bungled Bridge Rehab
Foundation failures and rehabilitations concern the owner, the engineer and the contractor. These parties face liability to one another as well as to third parties. There are contractual...

 

 

 

 

Return to search