A Signature Bridge for Boston (Available only in Structural Engineering Special Issue)
The first hybrid steel and concrete span in America will debut over the Charles River in Boston, carrying ten lanes of interstate traffic and serving as an elegant capstone to the largest...

Design of Blast Resistant Buildings in Petrochemical Facilities
This report provides general guidelines in the structural design of blast resistant petrochemical facilities. Informational coverage is provided for OSHA requirements, design objectives,...

For Whom the Bugs Toil
Bioventing is soil ventilation intended to enhance the biodegradation of petroleum hydrocarbon contaminants in soils by providing a supply of oxygen. Soil microbes are capable of consuming...

Guidelines for Retirement of Dams and Hydroelectric Facilities
Prepared by the Task Committee on Guidelines for Retirement of Dams and Hydroelectric Facilities of the Hydropower Committee of the Energy Division of ASCE. ...

In Situ Remediation of the Geoenvironment
The progress in the development and implementation of techniques for the remediation of contaminated soil and ground water has been and continues to be rapid. These proceedings focus on...

Stabilizing the Stacks
Spenser White and Prentis designed a hybrid soil nailing system to ensure that a historic library on the Bryn Mawr, Pennsylvania, campus would not be damaged during adjacent construction...

Chemical Grouting
Technical Engineering and Design Guide, as adapted from U.S. Army Corps of Engineers, No. 24. This manual provides information and guidance for the...

Electric Power Systems
This section discusses major components and subsystems of electric power systems. Also present is a guide for performing a post-earthquake investigation of electric power facilities, including...

Natural Gas Systems
This section provides an overview of natural gas systems, including their major components and subsystems. Also present is a guide for a post-earthquake investigation of gas systems....

Emergency Power Systems
This section provides an overview of emergency power systems, including components and subsystems. Also present is a guide for a post-earthquake investigation of emergency power systems....

Turnback Project Moves Ahead
The $202 million Muni Metro Turnback (MMT) Project, scheduled for completion in September 1996, includes an 840 ft section consisting of twin steel-lined tunnels that connects to the Embarcadero...

Containing Spills and Fire
A $95 million project to consolidate five jet fuel supply facilities that serve Los Angeles International Airport is nearing completion. The project shows how codes for wastewater-treatment...

Hydroelectric Pumped Storage Technology
International Experience
This Committee report, Hydroelectric Pumped Storage Technology: International Experience, was prepared by the Task Committee on Pumped Storage,...

Worth the Risk?
The construction process is fraught with uncertainties, but integrated, proactive risk assessment and risk management methods can help owners, engineers and contractors make better, informed...

Cable Corrosion in Bridges and Other Structures:
Causes and Solutions
This book provides the reader with basic facts concerning cable corrosion and means to avoid or rehabilitate corrosion damage. Corrosion problems associated with cable-supported structures...

A Simplified Process Audit to Design an Affordable Pollution Prevention and Waste Management Plan - Part 1
This paper presents a simplified approach to the general audit procedure that is applicable to the Small and Medium Enterprise (SME). The process leads to the identification of major sources...

A Multiperiod Approach for the Solution of Groundwater Management Problems using the Outer Approximation Method
In a previous work the Outer Approximation method was presented (Karatzas and Pinder, 1993 and 1996) for the solution of groundwater management problems where the selected pumping rates...

Use of SALQR Optimization in Large Aquifer Cleanup
A modified form of Differential Dynamic Programming (DDP), called Suc cessive Approximation to a Linear Quadratic Regulator (SALQR), is used to compute optimal policies for remediation...

A Graphical Environment for Multi-Dimensional Surface Water Modeling
Recently the Engineering Computer Graphics Laboratory of Brigham Young University in conjunction with the U.S. Army Engineer Waterways Experiment Station and the Federal Highway Administration...

An LPI Numerical Implicit Solution for Unsteady Mixed-Flow Simulation
A Local Partial Inertia (LPI) technique is developed as an option within the National Weather Service (NWS) FLDWAV dynamic flood routing model to enhance its capability to model unsteady...

 

 

 

 

Return to search