Turnkey Hydropower at St. Cloud
The St. Cloud Hydroelectric Project is located at an existing dam on the Mississippi River in St. Cloud, Minnesota. The project consists of a two-gated spillway and an 8.6-megawatt powerhouse...

Liability Traps to Avoid
This presentation shows several problem situations and the rules of the game as played by the industry and the courts. It makes three basic assumptions. One, the Materials Engineer knows...

Avoiding and Resolving Disputes in Underground Construction
Successful Practices and Guidelines
A method of developing cooperative, problem-solving attitudes on projects through a basic risk sharing philosophy between owner and contractor is presented. Special contracting provisions...

Cautious Risk Taking
Traditionally, the design engineer could bear virtually unlimited liability for design failure. Now he is less vulnerable. The concept is less than 20 years old, but since the early 70s,...

They're Coming to America
Foreign firms have been involved in the U.S. construction market for decades but their role has been small. Foreign contractors lacked information and communication skills and they believed...

Contractability?Recent Concepts in Contracting
Owners are customizing project delivery systems by uniquely aligning service agreements and construction contracts. Seeking more productive ways to construct facilities, owners currently...

A Model Cost Comparison Between Construction Management and General Contracting
This paper presents a model cost comparison between general contracting and construction management in a typical mid-rise 5-10 story office building. The model separates cost of construction...

Project Constructability?A Contractor's View
This paper addresses a contractor's view of what can be done to improve project constructibility from the design through the actual construction of the project. It addresses...

Utilization of Specifications
Project specifications need to be practical, enforceable, and above all must be clear and specific enough to enable any competent builder to understand them, bid on them and carry them...

Mobilization for a Construction Project in an Urban Environment
Mobilization by a contractor for the construction of a major project must consider four basic objectives: efficient work performance, owner satisfaction, site safety, and minimal community...

Reflections on Design of a Turnkey Hydro-Power Project?Calaveras, California
Developing the Calaveras project under a turnkey agreement has shown that: (1) some 2 years can be saved, (2) cash flow for the owner is significantly delayed, because engineering is first...

U.S. Army Corps Engineers Construction Contract Claims Guidance System
Researchers at the U.S. Army Construction Engineering Research Laboratory (USA-CERL) have been developing an expert system called Claims Guidance System (CGS) to provide claims analysis...

Opportunities for Innovation in Construction Equipment and Methods
New applications and other significant driving forces indicate a strong opportunity for innovation in construction equipment and methods. Investigations of other industries provide a rich...

Subcontractors' Concerns Regarding Productivity
This study suggests that smaller contractors, many of whom operate as sub-contractors, are less interested than larger firms in taking an active part in identifying, funding, and conducting...

EJCDC General Conditions
One of the first and most important of the Engineer's Documents generated was the Standard General Conditions of the Construction Contract. The current version of the General...

Comparison of the EJCDC Documents with the AIA Documents
Both the American Institute of Architects (AIA) and the Engineers Joint Contract Documents Committee (EJCDC) publish a guide to the preparation of Supplementary Conditions which modify...

Limitation of Liability as Part of Negotiated Risk Allocation in Engineering Contracts
The use of risk allocation in design contracts has grown considerably over the past eighteen years and is now used extensively by architects and engineers. Negotiated risk allocation has...

Discussion of the Use of Multi-Design Contracts
The paper begins by defining the multi-prime contract for design services, under which there is more than one contract between design professional and owner for a single project. It then...

A Major Engineering Firm?User of the Documents
This paper contains the author's comments on the use of the Engineers Joint Contract Documents Committee (EJCDC) documents with emphasis on Engineer-Owner Agreements and on...

Arbitration's Role in Construction Disputes
The earliest arbitration idea arose when two parties to a contract were unable to agree and thereupon submitted the question to an independent party to decide the issues. Most states now...

 

 

 

 