The Outardes 2 Concrete-Faced Rockfill Dam
The main dam of the Outardes 2 development consists of a rockfill embankment, built against an old water-retaining structure, and faced with an upstream concrete membrane. The interface...

Design of Deer Creek Dam
The Deer Creek Dam is proposed to be a concrete face rockfill structure (CFRD) with upstream and downstream slopes nominally 1. 3 horizontal to 1 vertical. The embankment will rise 280...

Innovative Powerhouse Designs
Since 1978, interest in small scale hydroelectric projects in the U.S. has jumped to a new high. Both new sites and modification of existing dams have received scrutiny by both private...

Construction of Two Spillways Using Roller Compacted Concrete
Roller Compacted Concrete (or RCC) is a relatively new method of construction and in many projects can be a low cost alternate to or foundation for conventional reinforced concrete. The...

Water Supply
The Foothills Project adds 125 mgd (5.5 m�/s) to the Denver area water treatment capacity, and saved approximately $1 million in energy costs in the first year of its operation. The $163...

RCC Dam Incorporates Innovative Hydraulic Features
An overview of the features of Monksville Dam is presented, with emphasis on the hydraulic components of the project. This 150-foot (45-meter) high roller compacted concrete structure...

The Design and Construction of the Bartletts Ferry Labyrinth Weir Spillway
The discharge capacity of the Bartletts Ferry Project has been increased 165 percent by the addition of a labyrinth weir spillway. The hydraulic design was based on a published design...

Willow Creek Dam--To Be or Not To Be
In Heppner, Oregon, several alternatives for flood control were considered. A concrete gravity dam constructed using roller compaction methods was selected because of the greatly reduced...

Operation of Glen Canyon Dam Spillways--Summer 1983
Flood control at Glen Canyon Dam is provided by a 41-ft (12. 5-m) diameter tunnel spillway in each abutment. Each spillway is designed to pass 138,000 ft**3/sec (3907. 7 m**3/sec). The...

Pipe Spillway Plunge Pool Design Equations
An equation is given to determine if scour holes will beach and widen excessively. For nonbeaching scour holes, dimensionless equations are given for the progression of scour with time...

Modeling Aeration Devices for Glen Canyon Dam
The 41-ft (12. 5-m) diameter tunnel spillways at Glen Canyon Dam experienced major damage during the 1983 spring runoff. This damage was initiated by cavitation. Hydraulic model studies...

Bureau of Reclamation Hydraulic Laboratory
The Bureau of Reclamation used hydraulic models for the first time in 1930 in the laboratory of the Colorado Agriculture Experimental Station in Fort Collins, Colorado. In 1946 the Reclamation...

Accomplishments and Impacts of Reservoirs
Water resources have been developed by dams and diversion structures and utilized to meet the needs of civilization since ancient times. Today, water resources developments including multiple...

Earth Reinforced Dams: First in U.S.
Earth reinforcement has in recent years been applied in the restoration and construction of dams. Earth reinforcement has been used to raise dam heights, replace traditional earth embankments...

Fiber Reinforced Concrete
In the past 10 years or so, concrete reinforced with fibers one or two inches long has begun to be used, first on a demonstration and experimental basis, then in major everyday applications....

Don't Always Put Dam in Narrowest Part of Valley
Hydraulic factors must be taken into account in dam planning and design, because the best structural design is not always the most economical. When the potential for downstream flood damage...

Tarbela Dam�Problems Solved by Novel Concretes
While constructing the world's largest embankment dam, Tarbela in Pakistan, the designers and contractors faced unprecedented flow volumes and velocities, causing severe cavitation...

Temporary Detention Cuts Storm Flow Peaks
In the Chicago area, ordinances require that the storm water runoff rate of a site after development be no more than it was before site development. This is because urbanization is often...

Dam Anchored to Foundation to Withstand Floods
Federal Power Commission Order No. 315 required a safety review of Conowingo Dam and Powerhouse by an independent board of consultants. As recommended by this board, a study was made of...

Kamburu Dam: Diversion Conduit Designed into Spillway Saves $1,000,000
Careful coordination of dam construction operation with river stages over several seasons, and a construction sequence that called for building the spillway, in effect, from the top down,...

 

 

 

 

Return to search