The Mission of the Corps of Engineers, South Pacific Division, in Hazardous/Toxic Waste (HTW)
This paper discusses the various roles and relationships that the South Pacific Division has for HTW activities within the division's four-state area (CA, AZ, NV, and UT)....

California Standards for Characterizing Contamination and Assessing Risk from Hazardous Waste Sites
The Toxic Substances Control Program (TSCP) of the Department of Health Services is responsible for managing California's hazardous waste program. A primary goal of TSCP is...

Ground Water Treatment System Using UV/H2O2 at Sacramento Army Depot
Ground water beneath the Sacramento Army Depot (SAAD) is being extracted and treated as part of a ground water remediation program. The extraction system is achieving contaminant capture...

The State Water Board's New Monitoring Requirements
In coordination with Department of Health Services' (DHS) efforts to gain 'State Authorization' to administer the federal hazardous waste management...

Ground Water Recharge in Central and West Coast Basins
The agencies responsible for the Central and West Coast Basins of Los Angeles County, California have managed their ground water supplies by the artificial recharge of reclaimed and imported...

Proposed California Regulations for Groundwater Recharge with Reclaimed Municipal Wastewater
The proposed California regulations for groundwater recharge with reclaimed municipal wastewater are presented with the basis and rationale for key requirements. The treatment and recharge...

Setting Standards in San Diego
Most engineering firms have developed specifications and standards that become the bible for project-related design issues�and no two firms are the same. On complex, large-scale projects...

The Impact of Drought on Hydropower Generation-Case Study of Bureau of Reclamation Hydropower Plant
The paper explores the effects of extended drought on power generation at Shasta hydropower plant, a Bureau of Reclamation facility in Northern California. Statistical measures of water...

Altering Federal CVP Power Operations to Accommodate Fisheries' Survival on the Sacramento River
Balancing the needs of the river users, water and power users, and the fishery needs is a formidable task requiring sacrifices by all the users particularly during this time of drought...

North Fork Feather River Erosion Control Program
PG&E, an investor owned gas and electric utility serving northern and central California, has been engaged since 1984 in the development and implementation of a regional erosion...

Lake Siskiyou Power Project
The Lake Siskiyou Power Project was constructed at the foot of the existing Box Canyon Dam on the Sacramento River in Northern California. Major project features included the construction...

Screening Data with an Expert System (PDAS)
The performance of a three-mile long penstock, constructed in an active landslide area in northern California, is monitored using 138 vibrating wire-strain gauges. Readings are taken daily,...

A Flow Forecasting System for Hydro Power
The flow forecasting system comprises a network of meteorological stations, a weather forecasting model, and a watershed hydrologic model, implemented in a microcomputer. The meteorological...

Implications of the 1987-1990 Droughts for Hydropower Generation at Reclamation Powerplants
Droughts in the western United States beginning in 1987 have caused water supply shortages and required rationing of water in some areas. The reductions in water supply have also impacted...

Development of the Collett Reservoir Addition to the Muck Valley Hydroelectric Project
The existing 26 MW Muck Valley Hydroelectric Project is located on the Pit River, 90 miles east of Redding in Northastern California. The Project was licensed by the Federal Energy Regulatory...

Bishop Intake #2 Spillway Modifications: A Case History
This paper covers the history of the events leading to the modification of Southern California Edison's (SCE) Bishop Intake 2 to pass a site specific design flood. From the...

Design of Penstocks in Severe Earth Slide Locations
This paper deals with the problems of locating a penstock for a small hydroelectric plant at a site in Northern California that experiences considerable land movement during the rainy...

Penstock Monitoring System in Active Landslide Areas
During initial planning of a high-head, five megawatt hydroelectric plant in Northern California, it was identified that the entire three-mile length of a 40 inches welded steel penstock...

The Unusual History of a Flowline Canal Within a Reservoir
This paper discusses the history of and remedial repairs to a flowline canal which carries water from the headwater of Lake Isabella in California to Southern California Edison Company's...

Description and Evaluation of Program: SNUSM
The Staggered Net Unsteady State Model (SNUSM) was developed in the early 1980's by the United States Bureau of Reclamation under the direction of Bob Gooch and Al Graves....

 

 

 

 

Return to search