Natural Salt Pollution in the Brazos River Basin
Water quality in several major river basins in the Southwestern United States is seriously degraded by natural salt contamination. The salt originates from geologic formations underlying...
Who Pays for the Unexpected in Construction: Hi-Rise Engineers Point of View
The unexpected in high-rise construction can be traced to design criteria evolving from environmental models and probes, as well as 3 general problems dealing with quality control in contract...
Who Pays for the Unexpected in Construction
The problem of who pays for the unexpected in construction is discussed in relation to the testing and inspection of construction materials. Laboratory is often blamed for poor construction...
Partnering: Contracting for Quality
The concept of partnering is an approach to conducting business that confronts the economic and technological challenges confronting the U.S. Construction Industry in the 1990's....
Determining the Optimum Level of Quality Management Effort
Quality management is an essential factor in construction project success. Determining the appropriate level of quality management effort remains a challenging managerial decision. A discussion...
Construction Inspection Responsibility from the Viewpoint of a General Contractor and Construction Manager on a GMP Project
Absent local laws to the contrary, any member of the construction team, the Owner, Architect, or Contractor, can theoretically arrange for and provide any testing and inspection that may...
Contractor Inspection
Partnering between the owner, architect-engineer (A-E) and construction contractor creates an environment which facilitates the successful completion of quality construction. Each participant...
Construction Quality Management
The Resident Management System (RMS) is a microcomputer based quality management and contract administration system designed specifically for resident engineers, by the Los Angeles District,...
The California Coastal Zone Experience
This proceedings,
Environmental Engineering
This proceedings,
The Debate Over Large Dams
Dam megaprojects across the globe are under increasing scrutiny. Critics say large dams have clearly lost their luster. While the outcry over huge public subsidies and high ecological...
The Effect of Surface Films on Concentration Fluctuations Close to a Gas/Liquid Interface
Modeling of gas/liquid mass transport requires knowledge concerning the behavior of near-surface concentration fluctuations at clean and film-covered gas/liquid interfaces. Previous measurements...
Methane Tracer Technique for Gas Transfer at Hydraulic Structures
Using a simple headspace gas chromatographic technique, gas transfer at several hydraulic structures were investigated. Naturally occurring methane was used as a tracer gas to measure...
A Gas Chromatographic Protocol for the Measurement of Krypton Gas in Water
This paper presents the results of a study to investigate the feasibility of using a gas chromatographic (GC) technique for the measurement of non-radioactive krypton gas concentrations...
Characteristics of Low-Slope Streams that Affect O2 Transfer Rates
Multiple-regression techniques were used to derive the reaeration coefficients estimating equation for low sloped streams: K2 = 3.83 MBAS-0.41...
Development of an Expert System for Estimating Stream Reaeration Rates
This paper describes a data base of measured reaeration coefficients organized to assist users with estimating coefficients for rivers and streams with hydraulic characteristics similar...
Epilimnetic Dissolved Oxygen Content and Surface Water Pump Performance
Surface water pumps have been operated and monitored at TVA's Douglas Dam since 1987. The purpose of these pumps is to improve the dissolved oxygen (DO) content of the hydropower...
Gas Transfer Velocities on Lakes Measured with Sulfur Hexafluoride
Gas transfer velocities have been determined on five lakes ranging in size from 0.13 km2 to 450 km2 using...
Technology Development for Auto-Venting Turbines
Experimentation with venting air into the hydroturbines at Norris Dam has convinced the Tennessee Valley Authority (TVA) that this is a viable method for increasing dissolved oxygen (DO)...
Sidestream Elevated Pool Aeration Station Design
The Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) is constructing a system of five Sidestream Elevated Pool Aeration (SEPA) stations along the 35.8 mile Calumet River,...
Return to search