Blue Marsh?A Modular Hydroelectric Project
The Blue Marsh Hydroelectric Project will be the first complete application of concepts developed in several research studies of modular hydroelectric power plant components. The Department...
Small Kaplan Versus Tubular and Francis Turbines
Mossefossen Power Plant is situated in the centre of the small town Moss in the southern part of Norway. Water flows from an existing dam through a 9 m**2, 175m long tunnel to the powerhouse...
Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...
More Kilowatts with Less Investment
The paper discusses partial or complete modernization of hydraulic units and/or governing system as a means to increasing profitability. A combination of general and case history applications...
Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...
Rehabilitation of Victoria Dam
Rehabilitation of a 54-year old thin concrete arch-buttress dam was completed without interruption of power generation using pressure injection of an epoxy adhesive. This paper presents...
Uprating Hydro Turbines and Generators
Various engineering evaluations of the turbine and generator components are required when considering uprating units. Often, certain turbine and generator components have to be redesigned...
The Lowell Hydroelectric Project: A Case Study
The Lowell Hydroelectric Project, located on the Merrimack River in Lowell, Massachusetts, consists of an existing dam, canals, and turbine generating equipment presently operating at...
Public Involvement Strategies: A Case Study in Citizen Participation
Literally millions of dollars are wasted every year because authorized and funded water projects are stalled in court, hung up in administrative proceedings, or delayed while the project...
Small-Hydro Development and Public Decisionmaking
This paper is based on a larger study (Soden, 1985), and employs concepts distilled from public choice theory - an increasingly well-accepted approach to the study of public policy and...
Resolving Environmental Conflicts During Licensing?A Case History
Vischer Ferry and Crescent Dams are located on the lower Mohawk River near Albany, NY. In September 1982, the Power Authority of the State of New York filed license applications with the...
Wilderness Hydrometeorological Study in the Colorado River Basin: A Case Study in Natural Resource Conflict Resolution
This paper describes the formation and progress of the Interagency Committee on Wilderness Hydrometeorological Data Collection (ICWHDC). It highlights how the ICWHDC is attempting to resolve...
Simplified Model for Micro-Hydro Feasibility
A computer model was developed for evaluating the preliminary hydraulic and economic feasibility of potential micro-hydro development sites. Among the main objectives of the model are...
Computer Modeling and Applications
A series of programs is available to evaluate the hydrology, compute the capacity to generate energy, establish unit costs, analyze penstock surge pressures, and simulate ramping rates....
Ester West Slide?A Case History
An 80 foot high embankment was benched into graphitic schist permafrost on a north facing slope approximately 25 miles west of Fairbanks, Alaska. Soon after construction approximately...
Characterization of the Dalton Highway Foundation Soils
A case study is presented of the landform-based probabilistic-statistical route geotechnical characterization of natural foundation soils along the Dalton Highway. Landforms were mapped...
Cold Regions Features of the Whittier Access Tunnel
A feasibility study and cost estimate has been prepared for a vehicular tunnel which would form a portion of a highway between the town of Whittier, Alaska and the east side of the Kenai...
Massive Ice Detection by Earth Resistivity
This paper presents two case histories utilizing remote sensing earth resistivity equipment to target subsurface massive ice locations. In one case, a number of probe locations were made...
Performance Study of the Lagoon at Inuvik, N.W.T.
Since 1957, Inuvik's sewage has been discharged into a lagoon situated northwest of the townsite. In 1982 the lagoon was upgraded to a two-stage system. Two primary cells...
Evaluation of Sewage Treatment Requirements in Cold Regions: Case Study?City of Whitehorse
This paper describes a method available for evaluating sewage treatment requirements in cold regions. The City of Whitehorse wastewater management situation has been used as an example...