On-Site Rehabilitation Capabilities for the Nineties
This paper will review recent technological advancements in on-site manufacturing and machining capabilities which have been developed for the proper installation of new hydro turbines....
An Overview of the Latest Developments in the Modernization, Upgrading and Rehabilitation of Existing Hydraulic Turbines
The growth experienced in the 1980's in the modernization of older hydro plants has fueled the development of new runner and wheelcase designs and modifications providing...
Weld Overlaying with a Cavitation-Resistant Alloy
The characteristics and applications of a cavitation-resistant alloy, Hydroloy HQ913, are described. The alloy as weld overlays applied on hydropower plant components by covered electrodes...
New Interior Lining for Welded and Riveted Penstocks
Pacific Gas and Electric Company (PG&E) has 73 hydroelectric power facilities installed throughout its distribution system. Each of these facilities has at least one penstock,...
Position Indicator Arrangements for Gates
There are several types of position indicator arrangements that can be installed for various types of gates. These arrangements include mechanical, hydraulic and electronic types. Larger...
Diagnostic Testing and Repair of Grand Rapids Generating Station's Unit Four
This paper is a case history that discusses diagnosis and correction of a variable pitch propeller type (Kaplan) hydraulic turbine problem. The turbine problem involved fatigue failures...
Pressure-Time Method Using Modern Practices
Over the past twenty years, Hydro-Quebec has modernized the pressure-time method of flow measurement, a method which is generally economical but sometimes difficult to apply. Starting...
Vibration of Penstocks in Hydroelectric Installations
In many penstocks and pump discharge lines of turbines and pumps, pipe vibrations have been observed. Many of these installations have blade and vane arrangements other than the classic...
Turbines and Pump Turbines for Ultra High Heads
The paper describes the turbine development in Norway as background for high head turbine technology and shows a typical Norwegian high head Francis as an example. High head reversible...
Case Study in the Upgrade and Rehabilitation Techniques of a Pumped Storage Installation
This paper presents a specific case study in the runner upgrade and unit rehabilitation of two pump/turbines at the Seneca Powerhouse. The study addresses the modern optimized designs...
Multi-Purpose Subsurface Drainage System for the Town of Saguache
The town of Saguache, Colorado had a high water table during the irrigation season that caused numerous problems within the town and resulted in high infiltration rates to the sewer system...
Hydrologic Impact of Reservoir Filling on a Fractured Crystalline-Rock Aquifer
A study of flow in and recharge to fractured rock has been initiated in conjunction with the construction and filling of a pumped-storage reservoir for a hydropower plant in the Blue Ridge...
Transportation of Cities' Colorado River Water in the Salt River Project's Canal System
Cities in the Phoenix, Arizona, metropolitan area have contracted with the Central Arizona Water Conservation District to take delivery of Colorado River water. Many of their water treatment...
Modeling of Reactive Chemical Transport of Leachates from a Utility Fly-Ash Disposal Site
Fly ash from fossil-fuel power plants is commonly slurried and pumped to disposal sites. The utility industry is interested in finding out whether any hazardous constituents might leach...
Evaluation of the FASTCHEM Model for Predicting Leachate Attenuation at Fossil Power Plants
The Tennessee Valley Authority (TVA) has applied the model FASTCHEM to identify retardation mechanisms and predict solute transport at two fossil power plants. FASTCHEM (acronym for fly...
An Energy Approach to the Analysis of Partially-Saturated Flow
When fluid passes into or out of an aquifer, work is done at the boundaries which is partly used to change the internal energy of the system and partly to overcome resistance to flow....
Application of Decision Analysis in Groundwater Remediation Design
The design of groundwater remediation systems involves selecting from a set of design alternatives under conditions of uncertainty. A risk-based decision analysis approach is presented...
Application of Tracer Tests in Groundwater Remediation Design
Recent advances in the area of field testing for the quantification of hydraulic conductivity have resulted in improved site characterization of aquifer hydraulics and greater reliability...
Effect of Nile River Flow on Performance of Shoubrah Power Plant Cooling System
Shoubrah El-Khimah Power Plant was built in 1982. Its peak capacity is 1200 MW, generated by four units, three of them having one cooling water intake. The cooling water pumps suffer from...
Tailwater Concerns and the History of Turbine Aeration
All new proposals for hydropower development and many of the almost 300 hydroelectric projects which will be relicensed before 2000 will have to address the issue of minimum dissolved...