The Emergence of Am?nagement in the California Coastal Zone
For several decades now the California Coast has been under intense development pressures. The passage of Proposition 20 in 1972 and the subsequent package of Coastal Legislation in 1976...

Off-Site Water Quality or On-Site Productivity
Nonpoint sources of pollution are being recognized as the primary source of water quality degradation in many coastal areas. In those areas where management programs are being implemented,...

Federal Policies in Water Resources Planning
The adequacy of current federal policies and institutional arrangements for water resources planning is assessed. Conclusions and recommendations are presented in five key areas: (1) Water...

Watershed Management in the Eighties
The papers included in this publication discuss state-of-the-art methods and current research on management and present case studies on current projects and practices on applied watershed...

Negotiation and Contract Management
A contract is the result of a negotiation leading to an agreement between two parties. A successful contract usually meets the needs of both parties. Satisfaction of needs is the reason...

Hydropower
Recent Developments
The Foothills Project has been under consideration by the Denver Board of Water Commissions for many years. It is one of the major steps in the continued efforts of the Board to provide...

Rock Masses
Modeling of Underground Openings/Probability of Slope Failure/Fracture of Intact Rock
While soil mechanics has been the dominant interest of Civil Engineers since Karl Terzaghi's recognition of the principle of effective stress, rock mechanics is becoming increasingly...

Engineering Surveying Manual
This manual is directed at the engineering manager who is responsible for planning and executing engineering projects which require the assistance of specialists in engineering surveying....

Waste Cleanup: Lessons Learned
Since hazardous waste mitigation is a new science, engineers need to pass on their experiences. The U. S. Army Waterways Experiment Station, seeking to expand the hazardous waste knowledge...

Opportunity Knocks from Behind Bars
As more and more lawbreakers are put behind bars, more and more prisons are needed, so the opportunities for civil engineers are expanding. Three major types of construction are being...

Get Involved with Cladding Design
Structural engineers should get involved with cladding design for their buildings. Including disclaimers for responsibility in the design contract will not prevent trouble or lawsuits,...

The Tunnel That Transformed Philadelphia
The 1985 Outstanding Civil Engineering Achievement is the Center City Commuter Rail Connection, a 1.7 mile tunnel connecting two former stub-end railroad stations in Philadelphia. The...

A Space Age Test Center
The Air Force's Aeropropulsion System Test Facility (ASTF) is the most expensive project the Air Force has ever built. Its massive heaters, coolers and compressors will treat...

Helms Pumped Storage Project
The powerhouse at California's Helms Pumped Storage Project is 1,200 ft below the surface of the Sierra Nevada mountains. Linking existing reservoirs, the project provides...

Who Should Design Bridges?
For many years Design-Build-Proposals have been common practice in Europe (except in the UK). Structures in these countries are 20% more economical than similar projects in the U. S.,...

Effects of Vehicles on Buried, High-Pressure Pipe
The mechanical effects of selected types of traffic on buried, high-pressure steel pipe are examined. Particularly considered is a section of the Colorado Interstate Gas (CIG) pipeline...

Effect of Shallow Trench Construction on Cast Iron Pipelines
This paper summarizes the results of three-dimensional finite element analyses to evaluate the strains and displacements sustained by 4, 6, and 8-in. (100, 150, and 200 mm)-diameter cast...

Successful Use of Trench Box in Sewer Line Construction
Faced with the problems of ever increasing construction costs, more and more methods are being employed in an attempt to keep expenses to a minimum without sacrificing the quality of construction...

Sewer Construction Inspection and Testing
Sewer construction testing is the final portion of the team effort that started with the goal of meeting the requirement for a sewer system for the protection of health and environment....

Unique Installation Methods for Large Interceptor in Poor Soil Conditions
The construction of approximately 1. 5 miles of a major sewer interceptor in downtown Boston encountered some unique construction challenges. The entire route required dewatering during...

 

 

 

 

Return to search