Preparation of a Geotechnical Baseline Report
This section discusses the preparation of a geotechnical baseline report. Topics include organization and content, writing the GBR, wording suggestions, and consistency and compatibility....

Applications for Other Excavations and Foundations
This section discusses the application of GBRs for other excavations and foundations projects, projects involving construction operations other than tunneling....

Roles and Responsibilities
This section summarizes the roles and responsibilities of the parties involved: owner, design team, contractor, construction manager, and dispute adjudicators....

Structural Safety and Its Quality Assurance
Sponsored by Committee 9A/10 of the Council on Tall Buildings and Urban Habitat of the Structural Engineering Institute of ASCE. This report uses an...

The New Tacoma Narrows Suspension Bridge Introductory Project Information
On September 25, 2002, Notice-to-Proceed for a design-build agreement was issued by the Washington State Department of Transportation (WSDOT), directing Tacoma Narrows Constructors (TNC),...

New Shear Stud Provisions for Composite Beam Design
The 2005 American Institute of Steel Construction (AISC) Specification for Structural Steel Buildings (AISC 2005) will contain significant changes to the shear connector provisions for...

Calendar: A 1986 Calendar Illustrating the Statue of Liberty: An International Historic Civil Engineering Landmarks
Illustrations include: Castle Garden, NY 1892; Construction of the Head; Presentation of the Statue of Liberty in Paris, 1988 / The Eiffel Tower; The Foundation; Gustave Eiffel.s Support...

Toronto Takes Off
Travelers using Toronto's Pearson International Airport will soon be passing through a new, state-of-the-art terminal, the centerpiece of a 10-year airport redevelopment project....

Crossing the Hollandsch Diep
The design/build team charged with creating an aesthetically pleasing bridge in the Netherlands for high-speed rail faced tough requirements, among them tight construction tolerances and...

Repairing Pittsburgh's Portal
Engineering the rehabilitation of Pittsburgh's Fort Pitt Bridge and Fort Pitt Tunnel involved an extensive inspection of their condition and a detailed evaluation of alternative...

The Road from Kabul to Kandah?r
To have any hope of successfully rebuilding its ware-ravaged economy, Afghanistan will need a reliable transportation infrastructure. Reconstruction this heavily mined highway under a...

Rock on Down the Road
The reconstruction of 11 miles of U.S. Highway 52 through the heart of Rochester, Minnesota-known as the Roc 52 project-appears poised to become the standard by which all design/build...

The Best Alternative
The City of Portland, Oregon, is using a hybrid contracting scheme that combines the scheduling advantages of design/build with the control of a construction manager arrangement to construct...

A New Identity
By repairing and relocating steel trusses, replacing deteriorating approach spans, and replacing what, at the time of its construction, was regarded as a daring concrete truss, engineers...

Bridge and Tunnel Security
The American Association of State Highway and Transportation Officials and the Federal Highway Administration recently convened a panel of esteemed researchers and experts in bridge and...

Outside the Box
Employing an innovative design that made construction quick and economical, the box girder structure carrying Highway N-2 over interstate 80 near Grand Island, Nebraska, became the first...

Independent Research Assessment of Project Management Factors Affecting Department of Energy Project Success
Prepared for the U.S. Department of Energy by the Civil Engineering Research Foundation. This report presents the findings of a research study to improve...

Evaluation of Anchor Wall Systems' Landmark Reinforced Soil Wall System
With T.C. Mirafi's Miragrid & Miratex Geogrid Reinforcement ?Final Report
This report describes a HITEC evaluation designed to determine the basic capability and limitations of the Landmark/Mirafi System for use as a technically viable precast MSE retaining...

Terminal Transformation
Infrastructure improvements ranging from the extension and strengthening of an existing wharf to the construction of an intermodal rail yard are turning a 30-year-old cargo-handling facility...

Fast Track
The high-speed magnetic levitation rail is now in operation in Shanghai - the first of its kind in the world - demonstrates that this extraordinary technology can move people in a way...

 

 

 

 