Water for Life: Have Improvements in Water and Wastewater Infrastructure along the Rio Grande/Rio Bravo Affected the Lives of Mexico and Texas Border Residents?
Prior to 1990 the poor communities along the Mexico/US border did have not have comparable waterand wastewater infrastructure investments that exist in other US cities. The explosion of...

Innovative Methods Used in the Design and Construction of the New Tacoma Narrows Bridge
On September 25, 2002, Notice-to-Proceed for a Design/Build Agreement was issued by the Washington State Department of Transportation (WSDOT), directing Tacoma Narrows Constructors (TNC)...

Pioneer Square Areaways
Pioneer Square, one of the earliest neighborhoods in Seattle, is adjacent to Elliott Bay. Much ofthis part of the city originally was built on existing land that used to get flooded. When...

2008 Civil Engineering Industry Buyer' Guide
A Special Supplement to Civil Engineering Magazine
This guide covers the following topics: Construction materials; Geotechnical and environmental; Information technology; Pipelines, sewers, and accessories; Professional and professional...

Building Code Requirements and Specification for Masonry Structures
Containing Building Code Requirements for Masonry Structures (TMS 402-08/ACI 530-08/ASCE 5-08, Specification for Masonry Structures (TMS 602-08/ACI 530.1-08/ASCE 6-08) and Companion Committees
The Code covers the design and construction of masonry structrures while the Specification is concerned with the minimum construction requirements for masonry in structures. Some of the...

Achievements and Challenges of China Construction
China is at the starting point of an accelerative urbanization process. A great number of infrastructural projects and residential areas are under construction. This paper provides an...

Optimal Resource Allocation for the Cleanup of Petroleum Contaminated Sites
Site rehabilitation is conducted in many states using a risk-based corrective action process wherein alternative remedial actions are evaluated and implemented, depending on the level...

Modeling Fort Ord Site OU2's Remediation System Using Optimization
Fort Ord.s Site OU2 is located approximately 80 miles south of San Francisco near Monterey Bay in Monterey County, California. Fort Ord contains two landfills which were used for residential...

Adjustable Foundation Design Development Innovations in Arctic Engineering
The purpose of adjustable foundation systems is to accommodate a wide variety of soils, including those which have low bearing capacity or which may be subject to settlement and/or horizontal...

Some Case Histories of Pile Foundations in Permafrost
Foundations for permafrost conditions should conform to one of three basic design principles: keep it frozen, let it thaw, or thaw the ground before construction. To keep the permafrost...

Geotechnical Reports
This section discusses the geotechnical data report, geotechnical memoranda for design, and the geotechnical baseline report....

Preparation of a Geotechnical Baseline Report
This section discusses the preparation of a geotechnical baseline report. Topics include organization and content, writing the GBR, wording suggestions, and consistency and compatibility....

Applications for Other Excavations and Foundations
This section discusses the application of GBRs for other excavations and foundations projects, projects involving construction operations other than tunneling....

Roles and Responsibilities
This section summarizes the roles and responsibilities of the parties involved: owner, design team, contractor, construction manager, and dispute adjudicators....

Biological Nutrient Removal (BNR) Operation in Wastewater Treatment Plants
Biological Nutrient Removal (BNR) Operation Wastewater Treatment Plants instructs readers in the theory, equipment, and practical techniques needed to optimize BNR in varied environments,...

Structural Safety and Its Quality Assurance
Sponsored by Committee 9A/10 of the Council on Tall Buildings and Urban Habitat of the Structural Engineering Institute of ASCE. This report uses an...

The New Tacoma Narrows Suspension Bridge Introductory Project Information
On September 25, 2002, Notice-to-Proceed for a design-build agreement was issued by the Washington State Department of Transportation (WSDOT), directing Tacoma Narrows Constructors (TNC),...

New Shear Stud Provisions for Composite Beam Design
The 2005 American Institute of Steel Construction (AISC) Specification for Structural Steel Buildings (AISC 2005) will contain significant changes to the shear connector provisions for...

Calendar: A 1986 Calendar Illustrating the Statue of Liberty: An International Historic Civil Engineering Landmarks
Illustrations include: Castle Garden, NY 1892; Construction of the Head; Presentation of the Statue of Liberty in Paris, 1988 / The Eiffel Tower; The Foundation; Gustave Eiffel.s Support...

Natural Attenuation of Hazardous Wastes
Sponsored by the Natural Attenuation Task Committee of the Environmental and Multi-Media Council of the Environmental and Water Resources Institute of ASCE. ...

 

 

 

 