Engineering Surveying Manual
This manual is directed at the engineering manager who is responsible for planning and executing engineering projects which require the assistance of specialists in engineering surveying....

Transition in the Nuclear Industry
Significant changes have occurred within the utility industry within the past 10 years. Projected growth in electric power demand has not materialized. Nuclear power plants, with long...

Waste Cleanup: Lessons Learned
Since hazardous waste mitigation is a new science, engineers need to pass on their experiences. The U. S. Army Waterways Experiment Station, seeking to expand the hazardous waste knowledge...

Opportunity Knocks from Behind Bars
As more and more lawbreakers are put behind bars, more and more prisons are needed, so the opportunities for civil engineers are expanding. Three major types of construction are being...

Get Involved with Cladding Design
Structural engineers should get involved with cladding design for their buildings. Including disclaimers for responsibility in the design contract will not prevent trouble or lawsuits,...

The Tunnel That Transformed Philadelphia
The 1985 Outstanding Civil Engineering Achievement is the Center City Commuter Rail Connection, a 1.7 mile tunnel connecting two former stub-end railroad stations in Philadelphia. The...

A Space Age Test Center
The Air Force's Aeropropulsion System Test Facility (ASTF) is the most expensive project the Air Force has ever built. Its massive heaters, coolers and compressors will treat...

Helms Pumped Storage Project
The powerhouse at California's Helms Pumped Storage Project is 1,200 ft below the surface of the Sierra Nevada mountains. Linking existing reservoirs, the project provides...

Who Should Design Bridges?
For many years Design-Build-Proposals have been common practice in Europe (except in the UK). Structures in these countries are 20% more economical than similar projects in the U. S.,...

Effects of Vehicles on Buried, High-Pressure Pipe
The mechanical effects of selected types of traffic on buried, high-pressure steel pipe are examined. Particularly considered is a section of the Colorado Interstate Gas (CIG) pipeline...

Sewer Construction Inspection and Testing
Sewer construction testing is the final portion of the team effort that started with the goal of meeting the requirement for a sewer system for the protection of health and environment....

Unique Installation Methods for Large Interceptor in Poor Soil Conditions
The construction of approximately 1. 5 miles of a major sewer interceptor in downtown Boston encountered some unique construction challenges. The entire route required dewatering during...

Alternative Approaches for Waterhammer Analysis and Pipeline Protection
This paper provides a brief review of typical waterhammer problems and their solutions for pumping systems. Alternative approaches to identify and resolve design problems are discussed....

A Study of Inlet Control Alternatives for SWM
A laboratory study of alternatives for effecting inlet control on urban storm sewer systems for stormwater management (SWM) is described. The test facility was a full-size physical model...

Field Testing of 84-Inch-Diameter Plastic Pipe
During the summer of 1981, a research project was initiated to monitor strains and deformation in 84-inch diameter RPM (reinforced plastic mortar) pressure pipe. Three 20-foot (6. 1-m)...

Stormwater Routing for Small Sites
Traditional hydrologic analyses and detention design procedures are too time consuming and costly to be warranted for small projects. This paper discusses a direct solution for sizing...

Designing for Residual Flooding
Flood control projects should incorporate designs and responses for flooding of the protected areas due to exceedance, overtopping, or failure of the features. Design strategies for levees,...

Real-Time Monitoring for Ohio Basin Water Management
The Ohio River Division (ORD) of the Corps of Engineers operates 77 reservoirs in this basin for the purposes of flood control, conservation, hydropower, low flow augmentation, water supply,...

Geostationary operational environmental satellites (GOES) Data Collection Procedure?Ft. Worth District
The Fort Worth District Corps of Engineers is currently responsible for the daily operation of 22 federally owned reservoirs in Texas. This report describes this district's experience...

Modeling Boundary Layer Flow in Stormwater Detention Basins
An iterative procedure involving an implicit finite difference numerical scheme was implemented on an IBM personal computer for solving steady, uniform and nonuniform boundary layer flow...

 

 

 

 

Return to search