Design and Commissioning of the Philadelphia Hydroelectric Project
The Philadelphia Hydroelectric Project consists of a single horizontal-shaft double-regulated S-type unit, rated 3440 kW, utilizing a programmable controller for unit operation together...

Digital Control of 180MW Francis Turbines: Controller Design, Simulation, and Operational Results
The features of a new hydro-power station are outlined as are some specifications that the customer required of a digital controller. Both hardware and software aspects of this recently...

Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...

An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...

Efficiency in Auxiliary Electrical Systems
In 1984, during the preliminary design for the proposed second powerhouse at the Corps of Engineers' McNary Dam on the Columbia River, the more recent improvements and techniques...

Grand Coulee SCADA System Procurement
Purchasing a quality Supervisory Control and Data Acquisition (SCADA) or Energy Control System (ECS) at a reasonable price for a particular installation can be a challenging undertaking....

Generator/Motors and Adjustable-Speed Drives for Waddell Pumped-Storage Plant
This paper describes the pumping and generating units and associated electrical equipment planned for Waddell Pumped-Storage Plant. Waddell Pumped-Storage Plant is to be located near Phoenix,...

Kaplan Blade Angle Controller
This paper describes a recently developed computerized Kaplan blade angle controller that is capable of improving turbine performance. Model Tests or Index Tests produce the Three-D-Cam...

The Design and Operating Experience of a Multiplexer Application in Conventional Hydro Powerhouse Control
The design of the Bonneville Second Powerhouse control system presented an opportunity to replace conventional cables with a multiplexer system that would provide a two-way data communication...

Capabilities of Automated Control System Employing Advanced Programmable Controllers
This paper details Voith Hydro's range of experience in the use of Programmable Logic Controllers (P. L. C. 's) in the automation of new hydro electric sites....

Integrated Automatic Hydroelectric Plant Control
The increased acceptance and employment of microcomputers to control specific functions in small hydroelectric plants has led to computerized integrated total control of hydropower generation....

Voltage Versus Var/Power Factor Regulation on Hydro Generators
When paralleled to the utility bus, synchronous generators can be controlled using either terminal voltage or var/power factor regulation. Selection is dependent upon the size of the generator...

Hydropower in the Kodiak National Wildlife Refuge
The Terror Lake Hydroelectric Project is unique in that it is the only energy project to be constructed in a National Wildlife refuge. A National Wildlife Refuge has few equals to blocking...

The Stanley Canyon Conduit Hydroelectric Project
The Stanley Canyon Hydroelectric Project is an excellent example of the maximum use of a natural resource. The project is a combined water supply and hydroelectric facility which received...

Simply Complex
In California, after years of uncertainties and overcoming a complex myriad of hurdles, a major 205. 5 MW hydroelectric development project, financed by Northern California Power Agency,...

Upper Yellow River Projects and Longyangxia Station
The river stretch from Longyangxia to Qingtongxia, with a head drop of 1,465 m in a distance of 1,023 km (including backwater length of the Longyangxia Reservoir) is the focus of this...

Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part B: Rehabilitation and Enhancement of Project Civil and Mechanical Facilities
A feasibility investigation of rehabilitation alternatives was conducted which identified several alternatives for repairing the damage and placing both powerhouses back on-line. These...

Rehabilitation of TVA's Great Falls Project
After seventy-one years of productive service, this two-unit, 31,860 kV plant is undergoing a major rehabilitation. The deterioration of the project has been of concern since the beginning...

No. 1 Water Wheel Project, Gilman, Vermont
This paper describes the replacement of an old generating unit with a new unit in a turn-of-the-century mill building where three other such units were already operating. The key issues...

Echo Dam Small Hydrodevelopment
In the mid 1970's, Bountiful City Light and Power began investigating alternative energy sources to furnish power to their distribution system. They engaged the firm of Bingham...

 

 

 

 