Performance Analysis of Multipath Acoustic Flowmeters Under Various Hydraulic Conditions
Multipath, crossed plane acoustic flowmeters are being increasingly used for hydroelectric turbine efficiency measurement both for acceptance testing and efficiency mapping of units in...

Hydropower Research: The University Perspective
University hydraulic laboratories have provided applied research services for the hydropower community for many years. It is the contention of this paper that only limited technology transfer...

Waterpower 91?Laboratory Investigation of Syphon Intakes
The Federal Department of Energy, Mines and Resources (Canada) has funded four separate investigations of syphon hydro technology. These study phases, which were carried out by Acres Hydraulic...

Development of an Eicher Screen at the Elwha Dam Hydroelectric Project
The Eicher Screen is a relatively new concept for screening juvenile fish out of hydroelectric turbine penstocks. The concept was developed by Mr. George Eicher and one was recently installed...

Fish Bypass System Mathematical Models
Mathematical models for fish diversion systems based on fish behavior in conjunction with diversion system structural and hydraulic properties are developed. Guidance efficiency is described...

Hydroacoustic Evaluation of Deep and Shallow Spill as a Bypass Mechanism for Downstream Migrating Salmon at Rock Island Dam on the Columbia River
Hydroacoustic data were collected on downstream migrating juvenile salmon (Oncorhynchus spp.) during the springs of 1983 and 1984, and summer 1990 at Rock Island Dam on the Columbia River...

Design Concepts for Vertical Kaplan Turbines
In this paper, some general aspects as well as selected design details of vertical Kaplan turbines are presented. The Monroe Street project which is under construction right now serves...

Rocky Mountain Pump-Turbines and Related Mechanical Equipment
The Rocky Mountain powerplant will have three reversible, single stage, vertical shaft pump-turbine units, each having a maximum output of 321 MW generating and a maximum pumping capacity...

On-Site Rehabilitation Capabilities for the Nineties
This paper will review recent technological advancements in on-site manufacturing and machining capabilities which have been developed for the proper installation of new hydro turbines....

An Overview of the Latest Developments in the Modernization, Upgrading and Rehabilitation of Existing Hydraulic Turbines
The growth experienced in the 1980's in the modernization of older hydro plants has fueled the development of new runner and wheelcase designs and modifications providing...

Weld Overlaying with a Cavitation-Resistant Alloy
The characteristics and applications of a cavitation-resistant alloy, Hydroloy HQ913, are described. The alloy as weld overlays applied on hydropower plant components by covered electrodes...

New Interior Lining for Welded and Riveted Penstocks
Pacific Gas and Electric Company (PG&E) has 73 hydroelectric power facilities installed throughout its distribution system. Each of these facilities has at least one penstock,...

Position Indicator Arrangements for Gates
There are several types of position indicator arrangements that can be installed for various types of gates. These arrangements include mechanical, hydraulic and electronic types. Larger...

Diagnostic Testing and Repair of Grand Rapids Generating Station's Unit Four
This paper is a case history that discusses diagnosis and correction of a variable pitch propeller type (Kaplan) hydraulic turbine problem. The turbine problem involved fatigue failures...

Pressure-Time Method Using Modern Practices
Over the past twenty years, Hydro-Quebec has modernized the pressure-time method of flow measurement, a method which is generally economical but sometimes difficult to apply. Starting...

Vibration of Penstocks in Hydroelectric Installations
In many penstocks and pump discharge lines of turbines and pumps, pipe vibrations have been observed. Many of these installations have blade and vane arrangements other than the classic...

Turbines and Pump Turbines for Ultra High Heads
The paper describes the turbine development in Norway as background for high head turbine technology and shows a typical Norwegian high head Francis as an example. High head reversible...

Case Study in the Upgrade and Rehabilitation Techniques of a Pumped Storage Installation
This paper presents a specific case study in the runner upgrade and unit rehabilitation of two pump/turbines at the Seneca Powerhouse. The study addresses the modern optimized designs...

Hydrologic Impact of Reservoir Filling on a Fractured Crystalline-Rock Aquifer
A study of flow in and recharge to fractured rock has been initiated in conjunction with the construction and filling of a pumped-storage reservoir for a hydropower plant in the Blue Ridge...

Modeling of Reactive Chemical Transport of Leachates from a Utility Fly-Ash Disposal Site
Fly ash from fossil-fuel power plants is commonly slurried and pumped to disposal sites. The utility industry is interested in finding out whether any hazardous constituents might leach...

 

 

 

 