An Integrated Project Control Model
This paper defines the scope of current project control activities and presents an overview of the tools used to control projects. Problems with current project control systems and the...
Integrating Voice Recognition Systems with the Collection of Project Control Data
The Construction Industry in the 1990's will be dominated by emphasis on Productivity, Competitiveness and Innovation. Success or failure in these areas lies in one word, Technology, and...
Project Control Via Acoustical Sensing
This paper describes ongoing research into automating the process of collecting project control information using acoustical sensing devices. The paper describes how frequency spectra...
Resident Engineering Costs vs. Construction Costs for New York City Water Pollution Control Projects
This paper begins by describing the New York City fresh water system, water pollution control plants, and the development of capital programs. It then discusses contracting methods, construction...
Elements of Project Success
The Project Organization Task Force of CII has identified eight elements that determine project success. They vary in importance depending on the client and type of facility being constructed....
Decision Support System for Achieving and Measuring Design Effectiveness
A microcomputer program is developed to serve as a decision system for improving design effectiveness. The program, called 'Design Effectiveness Evaluation and Implementation...
Channel Tunnel, Texas Style
Two water supply pipelines under the Houston Ship Channel and Greens Bayou are an example of deep tunneling in soft ground. The navigable waters and the water-bearing silty soils in the...
1990: Decade of Natural Disaster Reduction
The loss from natural disasters is extensive. Earthquakes, windstorms, floods, landslides, volcanic eruptions, wildfires, and insect infestations have caused the deaths of nearly three...
Expert Systems for Civil Engineers
Education
While the technology of expert systems can provide engineers with another approach to the development of computable models for civil engineering problems, it is not clear what a course...
Waterpower Development: A Renewed Partnership
Efforts to meet the water supply and energy needs of the country in a changing economic, environmental, and technical environment create new opportunities for joint action by water and...
The Pacific Northwest Rivers Study: Development of a Rivers Inventory and Analysis System
To minimize conflicts between hydropower development and resource conservation, the Bonneville Power Administration and the Northwest Power Planning Council initiated the Pacific Northwest...
Pumped-Storage: An Analysis of Optimal Capacity
This paper presents a systems analysis procedure to evaluate planning alternatives for pumped-storage operated in an existing power system. This procedure can be used by planners and engineers...
Pumped Storage and Compressed Air Storage, A Comparison
Pumped storage hydroelectric power plants and compressed air energy storage (CAES) plants are used for peaking and intermediate duty on electrical utility load systems. In comparing pumped...
Selection of Jim Falls Turbine Generators
The selection of the unit configuration for the Northern States Power Company's Jim Falls Hydro Redevelopment Project was based on an extensive evaluation of various turbine...
Considerations for Retrofitting Large Dams for Hydropower
The majority of large dams which are currently being retrofitted for hydropower are either flood-control impoundments or navigation structures. In the Ohio River Division of the U. S....
Hydropower retrofit at the Toledo Bend Dam
Since the early 1970's, the Authorities have been examining the possibility of utilizing sluiceway releases to generate hydroelectric power to meet most of the demands of...
Optimizing Hydropower Potential Using Water Management Techniques
The development of hydropower facilities at existing dams creates an interesting dilemma to both public and private hydro developers: Is the proposed development the best-adapted use of...
Vilavilani Hydroelectric Project
There is an urgent need to solve the water and energy shortages in the Department of Tacna, on the coast of Southern Peru. The Vilavilani Hydroelectric Project could solve some of the...
Economic Analysis Guidelines?Western Area Power Admin
Guidelines addressing methods and procedures for evaluating benefit and cost components of power projects are being prepared for Western Area Power Administration to use in economic analyses...
Mini/Micro Hydro Applications in Remote Off-grid Areas of Ontario
This paper outlines the potential for remote off-grid small hydro development in Ontario and the present incentives that exist to develop these resources. Estimated costs of development...