RRR Design Standards: Cost-Effectiveness Issues
The Transportation Research Board study of geometric design standards for RRR projects is currently trying to match the logic of cost-effectiveness to the mostly judgmental process of...

Sighting Safety
This paper examines the interrelation between drivers' visual needs and the road environment. Specific elements of visual limitation and drivers at greatest risk are identified....

Location and Development of Safety Projects
Projects to be considered for inclusion in the Highway Safety Improvement Program (HSIP) must be part of a prioritized listing in which each project is based on accident experience or...

Evaluation?A Key to Safer Design Standards
Public highways are designed and constructed in accordance with established standards which have been developed over the years as a result of research studies or developed by committees...

A Salt Solution for Nuclear Wastes
The Department of Energy's Waste Isolation Pilot Plant in Southeastern New Mexico is the nation's first full-scale facility for disposing of radioactive waste...

Fire on the Water
Incineration is a promising hazardous waste disposal technique. However, nobody wants an incinerator constructed near him, so waste handlers are considering burning hazardous wastes at...

Attapulgite: A Clay Liner Solution?
Poor performance of clay liners at waste management facilities has resulted in the EPA mandate of synthetic polymeric liner materials to comply with zero penetration requirements. Laboratory...

Risk Assessment: Engineering Tool
In factoring in human-health impacts when tackling an environmental problem, risk assessment is often the best approach. Its use is growing fast. The technique increasingly is being used...

Regional Risk Assessment of Existing Buildings
This paper describes current research underway at Stanford University designed to develop a methodology for determining high risk buildings in a region. The work involves developing a...

Seismic Restraint of Hazardous Process Piping
The lack of appropriate guidelines for the design and installation of hazardous process piping in industrial facilities has created a potentially dangerous situation. Process piping carrying...

Ambient Vibration Testing of the Foothill Communities Law and Justice Building (abstract)
This paper presents the results of two ambient vibration tests conducted on the Foothill Communities Law and Justice Center Building. One ambient test was performed in 1985. The second...

A Recommended Federal Action Plan for Reducing Earthquake Hazards of Existing Buildings
In September 1985 a Five-Year Plan for reducing earthquake hazards of existing buildings was submitted to the Federal Emergency Management Agency. This plan, prepared by the Applied Technology...

Reshaping Providence
By moving railroad tracks, river banks and several roadways, Providence, Rhode Island is reclaiming some 45 acres in its downtown and capital districts. This public works package is the...

Disney Engineers Voyage to the Deep
The main show at the Living Seas Pavilion, part of Walt Disney Production's EPCOT Center, Lake Buena Vista, Fla., is a visit to a tropical coral reef deep under the ocean....

Alternative Dispute Resolution
Usually it takes far less money and time to resolve a construction dispute if a lawsuit and court trial can be avoided. In the mini-trial, te two or more parties agree to radically reduce...

Complex Tower Meets Quake Code
A Los Angeles building consists of a triangular 23-story office tower stacked on top of an 11-story rectangular parking garage. The dual-shape is unique in seismically active southern...

The Parking Problem
Corrosion of parking garage decks has become a multi-billion dollar problem, caused primarily by deicing salts that seep into the concrete and attack reinforcing steel. Design and construction...

Ports in Transition in the Developing World
Export led strategies have been proposed by the main financial institution as a way for these countries to emerge from the downturn. This policy relies heavily on foreign trade. Transportation,...

Berth 5-6 Pavement Performance: Port of Oaklan
In 1978 the Port of Oakland commenced a project to demolish the old Berth 5, 6 & 7 break bulk sheds, portions of the wharves, and the warehouses behind, and to construct container...

Construction Approaches to the Navy's Floating Pier Concept
The subject of this paper is a floating pier which is currently under evaluation as a more cost-effective solution for berthing Navy ships. This new approach to pier design was sponsored...

 

 

 

 