Compression Load Tests on Concrete Piles in Alluvium
A series of tests was accomplished during the design phase for the West Seattle Freeway Bridge Replacement project. The results of instrumented compression load tests in alluvial deposits...
Lateral Load Tests of Piles in Sloping Rock Fill
A new container wharf constructed at the Port of Los Angeles features vertical prestressed concrete piles to provide both vertical and lateral support. A rockfill embankment used to allow...
Pile Foundation Movements During Construction
Two case histories concern a shipyard wharf and work bay in Los Angeles harbor and an oil refinery expansion in Sumatra, Indonesia. The case histories provide further data on the nature...
Government Agency Perspective on Standard for Drilled Shafts
Relative to the proposed ASCE standard for Design and Construction of Drilled Shafts, the Tennessee Valley Authority (TVA) would be considered an 'owner'. However,...
Consolidation Performance of Soft Clays: Part 2. Predictions
The simplified version of the model described in Part 1 was used to predict the short-term performance of the St. Alban test fill. The long-term predictive capability of the model was...
Dredge Spoil Disposal Predictions and Performance: A Case History
A 146-acre dredge spoil disposal facility was constructed in Baltimore Harbor that received 3. 4 million cubic yards (2. 6 million cubic meters) of dredge spoil generated from construction...
Logan Airport Re-Visited
The first detailed evaluation of self-weight consolidation of a large hydraulic clay fill was performed during the construction of Logan Airport in Boston nearly 40 years ago. The paper...
Instrumentation Performance in Soft Clay Soils (A Case History)
In 1978, IDEAL BASIC INDUSTRIES, INC. initiated construction of a cement manufacturing plant located south of Mobile, Alabama on the Theodore Ship Channel. Because deltaic clays were too...
Dredged Slurry Stabilization for Seagirt Marine Terminal
The Seagirt Marine Terminal is constructed on reclaimed land on dredged spoil from the I-95 Fort McHenry Tunnel in Baltimore, Maryland. Three stabilization procedures considered applicable...
ASCE Salary Survey 1983
This is the seventeenth report in a series of biennial salary surveys conducted by the American Society of Civil Engineers. Salary data is reported on seven major categories for civil...
Repairing New York's Historic Bridges
The Brooklyn and Manhattan bridges are just two of New York City's venerable structures that are undergoing rehabilitation. Current work on the Brooklyn involves enlarging...
Infrastructure: Money and Methods
State and local governments have started to cope with their infrastructure problems by passing bond issues, establishing infrastructure banks to centralize resources and decision making,...
Wetlands Development in Moderate Wave-Energy Climates
For the last three years springs of Spartina alterniflora have been planted on portions of Theodore Island, a dredged material island in Mobile Bay, Alabama. The purpose of the planting...
Monitoring of an Ocean Dredged Material Disposal Site
The Tampa Harbor Project involves deepening and widening approximately 50 miles of existing shipping channel in Tampa Bay, Florida, with the removal of approximately 70 million cubic yards...
A Methodology for Open-Water Disposal Site Selection
Pascagoula, Mississippi, is the major industrial region in coastal Mississippi. The existing project, completed in 1965, provides for waterborne transportation from the Gulf of Mexico...
Charlotte Harbor Beach Nourishment
The project consisted of dredging approximately 300,000 cubic yards (229, 380 cubic meters) of material, utilizing a seagoing hopper dredge, from the entrance channel of Charlotte Harbor,...
Management Plan for Dredged Maintenance Material
The Mobile District Corps of Engineers is responsible for the maintenance of an authorized Federal deep-draft navigation project at Pascagoula Harbor, Mississippi. The development of the...
Offshore Dredging - Is it still Cost Effective for Beach Restoration?
Offshore dredging has been the source of sand for beach restoration in southeast Florida since Broward County constructed the first project in Pompano Beach in 1970. However, with increasing...
Long-Term Planning for Dredged Material Disposal
The dredged material produced from maintenance of the channel in Upper Mobile Harbor (UMH) is disposed into confined upland disposal areas provided by the project's local...
Long-Term Maintenance Dredging Permits - Florida's New Approach to Regulation
Previous approaches to regulating maintenance dredging activities in Florida generally have been myopic and failed to gather information that adequately reflects the needs for environmental...
Return to search