Solution to a Waterhammer Problem: A Case Study
Waterhammer is caused by a rapid change in the flow velocity of liquid in a pressurized pipeline. Therefore, the potential for waterhammer exists in almost every pressurized liquid piping...

Water Supply System Rehabilitation
This report was prepared to assist practicing engineers meet the challenge of rehabilitating old drinking water systems, many of which have been in existence for over 100 years and are...

A Knowledge-Based Approach to Improve Urban Transportation Decision-Making
This paper describes a microcomputer-based tool that has been developed to facilitate acquisition and improvement of skills in urban transportation decision-making, in an educational environment....

Land Application of Wastewater Sludge
Prepared by the Task Committee on Land Application of Sludge of the Committee on Water Pollution Management of the Environmental Engineering Division of ASCE. ...

Ocean Energy: Can It Compete?
Electric power plants using ocean energy are technically viable, but they tend to be cost-prohibitive. A study commissioned by the Electric Power Research Institute and carried out by...

Going Sewerless
An in-building wastewater recycling system is an option where lack of sewers, limits on water supply, and special concerns about water quality are obstacles. The system was incorporated...

Milan's Model Metro
A number of innovative geotechnical methods were used at the extension of the Milan, Italy, subway. Jet grouting, a technique used only a few times in the United States, was notable among...

Shake-Proof Dams
Seismic trouble spots in California and along the Pacific Coast usually get the most publicity. But many people don't realize that Wyoming, Illinois, South Carolina, Utah...

Pipe-lining a Pipeline
This core prestressed concrete cylinder pipe is now lining the inside of a major water supply tunnel in Alaska. Occasionally found in rock tunnels, or buried pipelines, large diameter,...

Back on Track at Coney
All New York City subway repairs take place at a repair shop in Coney Island. The shop's floor was plagued by settlement problems since its construction on a filled swamp...

Another Geotech Import: Deep Soil Mixing
A technique called deep soil mixing (DSM), imported from Japan, has been used to stabilize an existing dam foundation. When the Bureau of Reclamation discovered that Jackson Lake Dam had...

Ozoning the Aqueduct
Only the second of its kind in the United States, the Los Angeles Aqueduct Filtration Plant is using ozone to treat drinking water. The water comes from the Sierra Nevadas via the 300...

Resource Mobilization for Drinking Water and Sanitation in Developing Nations
The ASCE International Conference on Resource Mobilization for Drinking Water Supply and Sanitation in Developing Countries was held at the Caribe Hilton Hotel in San Juan, Puerto Rico,...

Computing in Civil Engineering
This book contains papers submitted for presentation at the Fourth Annual Conference on Computing in Civil Engineering. General topics include computer graphs, computer aided design, computer...

Sultan River Project Operation Study for the Sultan River Hydroelectric Project
The project will be operated to maximize energy production from the Sultan River within the operational constraints imposed by the water demand for the City of Everett and by the instream...

Lemon Dam Hydropower Project
The Florida Water Conservancy District (District), the entity responsible for the operation of the dam and for repayment of the costs, had been interested in the hydropower potential of...

Small Hydropower Potential in Missouri
The hydropower potential of small head plants on the Gasconade River was investigated. Since, it is felt that small head plants will have less environmental impact, thus it will be more...

Developmental Changes Due to Site Investigations
The Winooski Hydroelectric Company of Montpelier, Vermont is conducting the reconstruction of Dam #8 on the Winooski River in East Montpelier, Vermont. Unprecedented eminent domain proceedings...

Town Bluff Dam, Texas: A Federal?Non-Federal Hydropower Partnership
Town Bluff Dam is located in southeast Texas, on the Neches River about 45 miles north of Beaumont, Texas. The dam is one element of the authorized Lower Neches and Angelina Rivers, Texas,...

Mt. Tabor Hydroelectric Project
In 1980 the engineering staff of the City of Portland Bureau of Water Works identified several potential hydroelectric sites in Portland water supply and distribution system. The Mt. Tabor...

 

 

 

 