Winter Snowpack Augmentation in Utah
The snowpack enhancement cloudseeding program in Utah was operated continuously for ten consecutive years prior to the 1983-84 water year. It was designed to augment water supplies in...
Weather Modification Potential ? Santa Clara Valley
Santa Clara County of California has been a water deficient area. The Santa Clara Valley Water District has an obligation to the community and to the other water users in the State to...
Groundwater Basin Storage in Southern California
The feasibility of implementing a groundwater storage program in the Chino Groundwater Basin (Chino Basin) to increase the firm yield of the SWP (California State Water Project) is considered....
Ground Water Economics in the San Joaquin Valley
Ground water pumping in the San Joaquin Valley to supplement surface water supplies has increased from about 200 thousand acre-feet per year at the beginning of this century to nine million...
Drip Irrigated Cotton: Economics and Water Savings
Groundwater withdrawals for cotton production in the arid Southwest account for about 15 percent of all groundwater withdrawals. In Arizona, cotton's proportion of groundwater...
Residual Stresses in Piles and the Wave Equation
A data base of 18 vertical load tests on driven piles in sand is presented. On average the residual point load was 56% of the measured point load and the residual friction load 19% of...
Compression Load Tests on Concrete Piles in Alluvium
A series of tests was accomplished during the design phase for the West Seattle Freeway Bridge Replacement project. The results of instrumented compression load tests in alluvial deposits...
Lateral Load Tests of Piles in Sloping Rock Fill
A new container wharf constructed at the Port of Los Angeles features vertical prestressed concrete piles to provide both vertical and lateral support. A rockfill embankment used to allow...
Pile Foundation Movements During Construction
Two case histories concern a shipyard wharf and work bay in Los Angeles harbor and an oil refinery expansion in Sumatra, Indonesia. The case histories provide further data on the nature...
Government Agency Perspective on Standard for Drilled Shafts
Relative to the proposed ASCE standard for Design and Construction of Drilled Shafts, the Tennessee Valley Authority (TVA) would be considered an 'owner'. However,...
Consolidation Performance of Soft Clays: Part 2. Predictions
The simplified version of the model described in Part 1 was used to predict the short-term performance of the St. Alban test fill. The long-term predictive capability of the model was...
Dredge Spoil Disposal Predictions and Performance: A Case History
A 146-acre dredge spoil disposal facility was constructed in Baltimore Harbor that received 3. 4 million cubic yards (2. 6 million cubic meters) of dredge spoil generated from construction...
Logan Airport Re-Visited
The first detailed evaluation of self-weight consolidation of a large hydraulic clay fill was performed during the construction of Logan Airport in Boston nearly 40 years ago. The paper...
Instrumentation Performance in Soft Clay Soils (A Case History)
In 1978, IDEAL BASIC INDUSTRIES, INC. initiated construction of a cement manufacturing plant located south of Mobile, Alabama on the Theodore Ship Channel. Because deltaic clays were too...
Dredged Slurry Stabilization for Seagirt Marine Terminal
The Seagirt Marine Terminal is constructed on reclaimed land on dredged spoil from the I-95 Fort McHenry Tunnel in Baltimore, Maryland. Three stabilization procedures considered applicable...
ASCE Salary Survey 1983
This is the seventeenth report in a series of biennial salary surveys conducted by the American Society of Civil Engineers. Salary data is reported on seven major categories for civil...
Repairing New York's Historic Bridges
The Brooklyn and Manhattan bridges are just two of New York City's venerable structures that are undergoing rehabilitation. Current work on the Brooklyn involves enlarging...
Infrastructure: Money and Methods
State and local governments have started to cope with their infrastructure problems by passing bond issues, establishing infrastructure banks to centralize resources and decision making,...
Wetlands Development in Moderate Wave-Energy Climates
For the last three years springs of Spartina alterniflora have been planted on portions of Theodore Island, a dredged material island in Mobile Bay, Alabama. The purpose of the planting...
Monitoring of an Ocean Dredged Material Disposal Site
The Tampa Harbor Project involves deepening and widening approximately 50 miles of existing shipping channel in Tampa Bay, Florida, with the removal of approximately 70 million cubic yards...
Return to search