Relative Survival of Juvenile Chinook Salmon Through Bonneville Dam on the Columbia River
Preliminary results of a multiple year study indicate that juvenile chinook salmon passing through the juvenile bypass system at Bonneville Dam second powerhouse during the summer have...
Effects of Hydroelectric Turbine Passage on Fish Early Life Stages
Turbine-passage mortality has been studied extensively for juveniles and adults of migratory fish species, but few studies have directly quantified mortality of fish eggs and larvae. An...
Fish Entrainment and Mortality at the French Landing Hydroelectric Powerhouse
This case study explains the fish mortality study performed and results obtained at an existing hydroelectric powerhouse in Michigan. Undertaken in 1989 and 1990, this study provides data...
Fish Entrainment and Relicensing: Truths and Consequences
The states of Michigan, Wisconsin, and the U.S. Fish and Wildlife Service have issued guidelines that presuppose entrainment/turbine-induced mortality at most hydroelectric projects are...
Design of Extended Length Submerged Traveling Screen and Submerged Bar Screen Fish Guidance Equipment
The hydropower projects on the Snake and lower Columbia Rivers in the Pacific Northwest are unique because these rivers are also the spawning grounds for migratory salmon. The salmon swim...
Fish Protection at Water Intakes Using a New Signal Development Process and Sound System
American Electric Power Company, Inc., is exploring the feasibility of using a patented signal development process and sound system to guide aquatic animals with underwater sound. Sounds...
Atlantic Salmon Smolt Movement and Behavior at Vernon Hydroelectric Station
Behavior of emigrating Atlantic salmon smolts (Salmo salar) was studied at New England Power Company's (NEP) Vernon Hydroelectric Station located on the Connecticut River,...
Where's the Competition?: The Real Threats to Project Relicensing
The real potential competition in relicensing hydroelectric facilities is for use of the water and land resources currently dedicated to hydro power production. Relicensing applicants...
One Hydro Project?Many Regulatory Masters
A discussion of the dispersion of federal regulatory authority over the development of new hydro-power capacity is presented....
Legal Strategy in Dealing with Fish and Wildlife Resource Agencies
This paper is designed to provide a strategy for negotiating with Resource Agencies during the consultation and the 10(j) process. The strategy discussed herein can be reduced to three,...
Harrisburg Hydroelectric Project?Water Quality Issues
The Harrisburg Hydroelectric Project is a proposed 34.4 MW hydroelectric facility on the Susquehanna River near Harrisburg, Pennsylvania. The project will consist of a 16.5 ft high gated...
Fair Market Value vs. Net Investment
Among the 300 some hydro stations coming up for relicensing in the 1990s, some of them will certainly be taken over by the federal government or by competing license applicants. Under...
Fair Value, Net Investment and Relicensing
The Federal Power Act ('Act') requires that a Federal Energy Regulatory Commission ('FERC') license receive only 'net investment'...
How the Office of Hydropower Licensing Resolved Seven Recent Relicensing Disputes
In May 1989, the Federal Energy Regulatory Commission (Commission) issued relicensing regulations in Order No. 513 to (1) help licensees whose hydropower licenses were about to expire...
Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...
When FERC Investigates Your Unlicensed Project: A Five-Point Protection Plan
A FERC investigation into a project's jurisdictional status poses the potential for substantial risks and costs. This paper outlines a 'five-point protection...
Document Image Systems for Hydro License Compliance
This paper will present one company's experience in selecting and implementing a document imaging system for management of correspondence, environmental studies, dam safety...
Development of Small Hydro in Ontario
Ontario is Canada's most populous Province with approximately 10 million residents, representing 40 per cent of the country's population. The electricity needs...
Reviewing the Role of Hydropower in TVA Reservoir Operations
The Tennessee Valley Authority (TVA) has reviewed the long term operating priorities for its reservoir system to determine the appropriate role of water quality and recreation as compared...
Low Flow Impact on Power in the Great Lakes Basin
Approximately 94,400 mW of installed capacity in the Great Lakes Basin could be adversely affected by low levels/flows induced by drought or climatic warming. Methods for evaluating the...
Return to search