Systems Analysis for Fisheries Protection and Mitigation at Corps of Engineers Columbia River Dams
Pacific Northwest anadromous salmon and steelhead that migrate to and from the ocean are greatly affected by the numerous Columbia and Snake River dams they have to pass, first downstream...

Hydropower Simulation: An Overview
Numerous models have been developed for production costing and generation system expansion which include operation of hydropower in the system. These models rely on energy production and...

A Short-Term Hydro Scheduler for Hydro-Thermal Power Systems
This paper presents HYDSIM (Hydro-electric Simulation), a new versatile computer model developed to simulate the hourly or daily operation of a large network of multi-purpose reservoirs...

Real Time Hydropower Scheduling for Niagara Mohawk Power Corporation
Niagara Mohawk Power Corporation (NMPC) presently manually schedules their hydro system of 660 MW (80 stations in ten river basins). The scheduling procedures are labor intensive and relatively...

Multisite Hydrocomplex Optimization
A multisite complex is analysed in northern Quebec to decide the level of equipment needed that will supply firm energy at the best possible unitary price. Four possible sites were chosen...

Simulation of Irrigation and Reservoir Water Use
Computer simulation of irrigation water use and corresponding downstream reservoir operation has been developed for the Canyon Ferry Reservoir on the Missouri River in Southwestern Montana....

Computer-Aided Operation of a Hydropower System
This paper outlines the development of a computer model which optimizes the operation of a regulated river system given certain constraints using an adaptive deterministic linear programming...

Computerized Operation Models of Oroville Reservoir
Two monthly computer operational models, OROTHM1 and OROTHM2, were developed to provide more detailed operation and maintenance studies for the Oroville facilities. Currently another computer...

Hydrologic Dispatch Model for a Hydropower System
A hydrologic dispatch model was developed for an 11 plant, six reservoir hydroelectric system. The model incorporates load forecasting, system dispatching strategy, and database management...

Stochastic Optimization of Reservoir Systems Operations
This paper addresses the stochastic optimization of real-time monthly operations of multi-reservoir systems by Dynamic Programming. A two-stage optimization framework that consists of...

Development of Hydroelectric Scheduling Model
This paper presents the proposal preparation, pre- and post-award negotiations, and the engineering and computer software development of an hourly generation scheduling model. The Western...

Dam Safety Emergency Action Plans?A TVA-State Responsibility
The Federal Guidelines for Dam Safety requires each dam owner to prepare and maintain emergency action plans (EAP) for each of structure. These plans are necessary (1) to identify problems...

Rebuild of Ten Mile Intake Flume Structure for Electron Hydropower Project
In 1984 the Puget Sound Power and Light Company began a rebuild of what is popularly referred to as the 'world's crookedest railroad. ' The 'railroad'...

The Rehabilitation of Lake Harriet Dam
In 1984, the decision was made to rehabilitate the Lake Harriet Dam. The existing arch dam structure was encased with a rockfill buttress. The downstream buttress, which also acts as a...

Murray Hydro Project?Structural Design
This paper will summarize design criteria, parameters, methods of analysis, and other relevant data that were used in the design process of the structural features of the Murray powerhouse...

Design of Siphon Penstocks for Low Head Hydros
Siphon penstocks have been designed and constructed at Jim Falls and Winter, Wisconsin at existing dams. Both hydropower projects are located on the Chippewa River. The design of these...

Turbine Intake Modification for Fish Passage
This paper describes one solution the U. S. Army Corps of Engineers has found to improve juvenile fish guidance at Bonneville Second Powerhouse on the Columbia River. Juvenile fish passage...

The Design of the Outlet for the New Koepchenwerk Pumpstorage Plant
The Koepchenwerk Pumpstorage Plant (1930) is going to be replaced by a new plant with a 150 MW Pumpturbine in a shaft. This paper explains the reasons for this replacement and gives a...

Civil Design of Underground Hydro Power Projects
Various reasons exist for the development of underground schemes. Limited space at dam sites in deep and narrow river valleys makes it favourable to separate the power house from the dam...

Waterstop Technology?The Next Chapter
Water leakage through and around failed waterstops in concrete structures can cause serious flooding, damage to equipment, affect structural stability, and pose potential safety problems....

 

 

 

 

Return to search