Performance Analyses and Design for Urban Bus Transit
This paper describes a Management approach to Bus Transit Systems based on the treatment of Demand, Supply and Policy. The procedure described is currently supported by a series of interactive...

Institutional Barriers to Private Financing
This paper examines the general question of institutional barriers at federal, state and local levels of government to private participation and financing in urban transportation. He reports...

Pavement Management Systems for Urban Areas
Pavements represent the largest public investment for most urban-area governmental jurisdictions. The magnitude of this investment requires that the expenditure of funds to maintain pavements...

Gatlinburg's Transportation Management Plan
A series of transportation recommendations developed for Gatlinburg, Tennessee and the impacts of these transportation system changes are documented. Problems and recommended solutions...

Saving the Lady
Restoration of the Statue of Liberty is as much an exercise in cooperative management as it is in technical design and execution. Among those sharing management responsibility are: the...

The Federal Perspective
Between 1965 and 1982, the Federal Government spent about 125 billion for highway construction. Yet, elements constructed at the early phase of the Interstate System are now at the end...

Revitalization of Urban Water Supply and Distribution Systems: Detroit and Phoenix Case Studies
In 1980 the people in the Detroit Water and Sewerage Department were asking themselves the kind of question that is facing the managers of many municipal utilities in this country these...

Inventorying the System/Inspection Introductory Remarks
A major sewer system evaluation survey is nearing completion in the seven communities which make up Special District No. 1 of the East Bay Municipal Utility District. A major effort has...

On-Line Computerized Maintenance Management
Maintenance is the last cost saving frontier of scientific management. Top management has concentrated on production for generations, largely ignoring maintenance. The attitude of 'fix...

Infrastructure Project Management and the Power of Implementation
The purpose of this paper is to bring renewed attention to project management concepts and public policy implementation issues as they apply to infrastructure development and renewal....

Financing the Golden Gate Bridge?Past and Present
This paper discusses the financial side of the project, which was a very innovative solution that provided federal revenue not only for the Bridge Redecking Project, but more importantly...

Infrastructure Awareness: Successful Techniques
The need to rehabilitate and upgrade our infrastructure systems, specifically the systems of water supply and distribution, wastewater collection and treatment, bridges, highways and mass...

The National Infrastructure Act
Today, more than ever before, the United States faces a serious problem related to the condition and adequacy of its basic infrastructure - surface transportation, water supply and distribution,...

Learning From Failure
Innovative engineering design involves assumptions about the future use and behavior of a structure. By understanding and learning from the infrequent but spectacular large failures, engineers...

Frame Moments with the Takabeya Method
The Takabeya method of frame analysis, based on the same slope-deflection equations as the Hardy-Cross system, has the advantage of requiring much less memory and fewer computations than...

Rationalizing Land Records, Mapping, Planning
The way land records are kept and used in cities and counties is outmoded. The same is true for base mapping and land use planning. The computer is helping streamline all three, as is...

A Critique of Arctic Marine Site Investigation Techniques
Arctic marine site investigations have evolved from the need by oil companies to operate in offshore areas beyond the ice shear zone. An overview of the site investigation organization...

Electrical Resistivity Techniques for Offshore Arctic Geotechnical Engineering Applications
The electrical resistivity of an arctic marine soil depends on the porosity, pore water salinity, grain size and shape, clay content, and degree of ice-bonding of the soil. Therefore,...

NPDES Permits for Accelerated Oil & Gas Development
Section 402 of the Clean Water Act (CWA) requires the Environmental Protection Agency (EPA) to develop National Pollutant Discharge Elimination System (NPDES) permits for waste discharges...

Environmental Permitting Approaches for Future Development of Offshore Oil Fields in the Arctic
Environmental impact of petroleum prospecting on the North Slope of Alaska is complicated by climatic problems of long periods of low temperature and thick ocean ice. Better engineering...

 

 

 

 