ASCE Combined Index 1977
The 1977 ASCE Annual Combined Index provides a guide to materials appearing in publications of ASCE published during 1977. This includes papers and technical notes from ASCE technical...

Geotechnical Practice for Disposal of Solid Waste Materials
The papers for this conference are grouped under the themes of four of the general sessions: 1) Geotechnical properties affecting disposal and utilization; 2) utilization in dams, embankments,...

Pitfalls of Overconservatism in Geotechnical Engineering
The article cites at least three reasons why geotechnical engineers may be overconservative: (1) They may try to satisfy unreasonable standards established by themselves or others; (2)...

Mammoth Transshipment Terminal Links Montana Coal to Michigan Power Plant
In 1973 Detroit Edison contracted with the Decker Coal Company for 200 million tons (181 Tg) of Western low-sulphur coal over a period of 26 years to meet its requirement for low-cost,...

Making Maps by Computer
For making maps, digitizer-computer-plotter systems are increasingly popular. Here are case histories of three applications�by Brooklyn (New York City) Union Gas. Co. for keeping track...

Engineering Foundation; Still Going Strong at 63
An historical review is given about the creation of the EF by Ambrose Swasey in 1914 for issuing research grants and establishing conferences. The initial endowment of $800,000 increased...

Fast Programming on Small Calculators
A new technique presents a method of rapid programming of engineering formulas on calculators. The method minimizes debugging and documentation time. Formulas are programmed in only one...

Polymerization of Concrete Fights Cavitation
The techniques and materials used for the repair of concrete are many and varied. The repair at Dworshak Dam utilized epoxy resins, dry pack mortar, fibrous concrete and a new technique,...

Seattle Freeway Park; A Scene of Blissful Contrasts
The Seattle Freeway Park was nominated for honorable mention for OCEA. Although not of massive scale and not dramatically innovative in civil engineering design and construction methods,...

Sled Mounted Hydro-Jet Injector Buries Transatlantic Cable
A need for reliable and uninterrupted overseas telephone communications required that the transatlantic cable (TAT 5) be placed in a secure position below the ocean floor where it could...

Vibroreplacement and Reinforced Earth Unite to Strengthen a Weak Foundation
Two relatively new engineering concepts in the U.S. were successfully used to solve a difficult soils problem. A highway skirting Idaho's Lake Pend Oreille was built on a...

King Post Truss System Cuts Roof Framing Cost by 30%
The design was based on requirements for minimally obstructed sight lines (Robin Hood Dell Open-Air Theater, Philadelphia, Pa.) for outdoor seating and a tight construction budget of $4,500,000....

ASCE Sharpens Committee Management
With some 500 committees and $500,000 a year spent on committee travel, ASCE has a management challenge. To avoid waste and boost performance of committees, recently the Society asked...

An Experience in Standardization of Nuclear Power Plants
This article outlines successful efforts at design of five standardized nuclear units, in four different states in the U.S.A., for a group of five utilities. The Standard Power Block,...

A Report From the Executive Director: Society Dues to Rise Next Year
The Board of Direction at its spring meeting in Dallas, Tex., voted to increase dues in all member grades, to be effective January 1, 1978. Dues will then be as follows: Fellows, $70;...

Teton Dam Failure
In June 1976, Teton Dam in Idaho failed. It was an earthfill dam 305 ft high. It failed by piping through the impermeable core of the dam. Among factors believed contributing to failure:...

502-ft Diameter Laminated-Timber Dome Provides Fast, Low-Cost Cover for Arizona Stadium
Varex Dome, a 502-ft diameter engineering marveel of glue laminated timber, was built in record six months erection time. This dome shell structure forms both walls and roof for the new...

Civil Engineering History
Special Issue Celebrating ASCE's 125th Anniversary Turning Points in U.S. Civil Engineering History
This special edition celebrating ASCE's 125th anniversary contains articles reprinted from March 1975, May 1975, July 1976, October 1977, and December 1977 issues of Civil...

Granular-Fill Dam Protected by PVC Membrane
The design and construction of the Minorca Tailings Basin Starter Dam sets a precedent for the use of plastic membrane for seepage control in the construction of earth fill dams where...

Milestones in U.S Civil Engineering
Under the general titles of structures, transportation, water resources and sanitary, milestones in American civil engineering are listed in chronological order. An emphasis is placed...

 

 

 

 

Return to search