Proven Organic Coatings for Long Term Protection�� Part II
Recent advances in coatings materials and their application make possible improved protection of structures in normal or aggressive environments. Shopcoating and field application are...

World's Third Longest Cantilever Bridge
This report includes the planning, design and construction procedure of the world's third longest double deck, cantilever bridge, Osaka Port Bridge, which was completed in...

La Guardia Airport Parking and Terminal Frontage Structure
One of the world's largest parking structures, at New York City's La Guardia Airport, is of special interest because the structural steel has no fireproofing....

Paul Bunyan Among Offshore Steel Structures
The world's two largest drydocks, the larger 1,150 x 800 ft in plan were used to assemble on land the four steel jackets. They now stand in the North Sea in about 400-ft of...

Condeep�In 400 Ft of Water, Concrete Caisson Requires No Piles
The Condeep structure consists of (1) 19 cylindrical tanks each 66-ft diam and 164-ft high that together will store up to 900,000 bbl of oil; (2) the extension upward 300-ft more of three...

Concrete Barge of First Totally Offshore LPG Facility
Some 20 miles off Java, below waters 95-ft to 135-ft deep, is the Ardjuna Field, from which oil and gas soon will be taken. The adjacent coastal land is marshy, so onshore storage would...

Preview�1976 Offshore Technology Conference
In this Eighth Offshore Technology, the 300 papers and 1,300 exhibitors will be related to such topics as semi-submersible drill rigs, pollution avoidance devices, equipment protection,...

New Orleans Grows on Deep Piles
In the New Orleans area, tall buildings must be supported by piles extending at least into the preconsolidated clays at -150-ft (-46-m) or so. Settlement is much too severe and uneven...

Inverted Filter Stabilizes Soil, Stops Erosion
The inverted filter concept was invented by Karl Terzaghi to prevent dams from failing by water piping through the foundation. Laboratory and field testing have refined the necessary specifications...

Pioneer Offshore LNG Terminal
Among the new offshore structures along the east coast of the United States is a terminal facility about one mile off Cove Point, Md., in Chesapeake Bay. This terminal will take deliver...

Porous Friction Course Solves Airport Hydroplaning Problem
Several hydroplaning incidents had occurred at the Greensboro-High Point-Winston Salem Regional Airport, N.C. Hydroplaning occurs when hydrostatic pressure builds up in the field of surface...

Hydraulic Fill Dams/Earthquake Stability
The 1971 San Fernando earthquake near Los Angeles, Calif., generated concern for the stability of hydraulic fill dams. Two dams located near the fault were damaged severely. The shaking...

Stress Ribbon Bridge in Freiburg, Germany
A three span continuous stress ribbon bridge of 75, 130, and 138 ft, was built in downtown Freiburg, W. Germany, for pedestrian traffic. Structural analysis is similar to that of suspension...

Innovative Design at Florida Bulkhead Reduces Material and Construction Costs
Remedial work to an existing bulkhead at a deep-water berth for Port Everglades, Florida, has been done with substantial savings through the application of innovative design concepts....

Today's Northwest Passage
The Lower Snake River Project received the outstanding water resources engineering project award for 1976 from ASCE. The lower 140-mile (225-km) reach of the Snake River from its mouth...

University of Idaho Barrel-Arch Roof Wins Outstanding Structural Engineering Award
The world's longest span wood structure now covers the football stadium at the Univ. of Idaho in Moscow, Idaho. The trussed arch consists of an upper and lower wood deck connected...

ASCE Tackles Standards
ASCE is sharply expanding its standards activity. Standards committees are at work in the fields of building loads, fire safety of structures, steel box-girder bridges, nuclear power plants...

Structural Failures and How to Prevent Them
Reducing failures of buildings and other structures requires compentent design; clear communication of that design to the contractor by means of engineering drawings, etc.; careful and...

Value Engineering Made Mandatory on EPA Projects Over $10,000,000
EPA makes VE mandatory on projects over $10 million. Eleven VE teams in five 40-hour workshops. Isolated changes of $1.2 million on typical $4.1 million project which were acceptable to...

Highway in Harmony with Its Environment
The Vail Pass portion of Interstate 70 in Colorado is developing into a masterpiece of modern highway; designed and built to blend into a scenic mountain environment. The consultant's...

 

 

 

 

Return to search