Segregation of Sediment During Deposition
A laboratory experiment was conducted to investigate the segregation of sediment during deposition. Sediment eroded from an upslope source area of Blount silt loam was introduced to a...

Regulatory Floodway Width Estimation
A simple algebraic equation is presented for determining the width of the regulatory or designated floodway. The equation shows that for a given ratio of the permissible increase in flood...

Subsurface Drainage for Erosion Reduction on Croplands of Northwestern Oregon
Subsurface drains installed as a relief system on sloping cropland reduced surface runoff and soil loss from silty soils with underlying slowly permeable layers in northwestern Oregon....

Hydrologic Design Criteria for Dams with Equal Reliability
Appropriateness of design criteria which require using the same Antecedent Moisture Condition (AMC) throughout Kansas for sizing dams and emergency spillways was examined. AMC values which...

Tailwater Management with Surge Irrigation
Field data of surge irrigation has shown that, in the post-advance stage, there exists an optimum post-advance cycle time. Cycle time greater than or less than the optimum post-advance...

Feasibility of Weather Modification for California's State Water Project
The California Department of Water Resources (DWR), in the mid 1950's, contracted with some 30 water agencies to eventually furnish about 4. 2 million acre-feet (MAF) of water...

Runoff Model for Watersheds of Nonhomogeneous Characteristics
A watershed of any configuration, topography, and spatial distribution of cover, soil and channel characteristics is described as a plannar grid. Time-varying precipitation is applied...

Operation of Glen Canyon Dam during 1983 and 1984 and the Repairs of Glen Canyon Spillways (abstract)
The gates at Glen Canyon Dam were closed in the spring of 1963 and the reservoir did not fill until the summer of 1980. The spillways were tested in 1980 with only slight evidence of operational...

Building a Team, Not Just a Building
The best way to resolve construction disputes is to head them off. And the best time to step in is before your contractor is hired. In the private sector, there is no reason to open the...

Are Soil Moisture Accounting Models Needed for the Real Time Forecasting of River Flows?
The difficulties inherent in using conceptual rainfall-runoff models in conjunction with filtering techniques, for the real time forecasting of river flows, are reviewed. The issue of...

The Great Lakes Large Basin Runoff Model
The Great Lakes Environmental Research Laboratory (GLERL) developed its Large Basin Runoff Model (LBRM) specifically for modeling runoff and moisture storages in the large river basins...

Probabilistic Forecasts of Continued High Great Lakes Water Levels
Existing projections of Great Lakes water levels over the next several years do not consider how meteorologic variability affects the hydrologic processes (basin runoff, overlake precipitation,...

Spatial Attenuation of Major Pennsylvania Storms
To utilize point estimates for more expansive areas, reduction factors are necessary to account for the attenuation of storm magnitude with increasing area. The spatial attenuation of...

Design Rainfall for Pennsylvania
The most commonly used source of rainfall estimates is the U. S. Weather Bureau Technical Paper 40. A more detailed study of Pennsylvania storms was conducted in 1970 under the sponsorship...

Design Storm Selection for Stormwater Management Master Plans
The design rainfall event is an important performance standard for a stormwater management master plan. A stormwater master plan for Virginia Beach, Virginia, is used as a case study to...

Effect of Rainfall Intensity Distribution on Excess Precipitation
The effect of the time distribution of rainfall intensity on the prediction of the depth of excess precipitation is evaluated. A comparison is made of the excess precipitation produced...

The Estimation of Rainfall for Flood Forecasting Using Radar and Rain Gage Data
The use of radar-rainfall data in combination with rain gage measurements may improve rainfall estimates over those based on either form of measurement alone. A set of rainfall analysis...

Model Choice and Scale in Urban Drainage Design
This paper addresses the question of model choice and scale by comparing various model applications to a 95-acre gaged catchment, known as the Lake Hills watershed, in Bellevue, Washington....

Urban Stormwater Drainage Design by Modified ILLUDAS
The Illinois Urban Drainage Area Simulator (ILLUDAS) has been extended for continuous simulation by considering dry periods between storms. The model accepts predetermined hydrographs...

A Practical Hydrologic Model for Urban Watersheds
A typical problem in watershed management is determining the peak discharge and runoff volume for numerous and combined watersheds. The methods available to solve this problem are often...

 

 

 

 

Return to search