A Knowledge Based System for Design of Localized Mechanical Mixing Systems
Knowledge-based systems, frequently referred to as expert systems, have been used in a variety of computer-based design applications. They are particularly suited to design processes where...
LISP or CLIPS: Selecting an Expert System Tool in Hydraulic Engineering
The transfer of Artificial Intelligence(AI) technology from the research laboratories to the scientific and engineering environments has been made possible by phenomenal advances in computer...
Low Flow Index and Hydrogeological Characteristics
This work is set within a framework of research on drought phenomena, causes and effects, and the methods to fight the harmful effects of droughts in the agricultural, municipal and industrial...
GIS Visualization Techniques in Surface Water Resource Planning
Geographic information system (GIS) computer graphic displays of surface water resource conditions provides a means for valuation-by-visualization (VBV) of alternate plans. GIS display...
Applications of GIS for Water Quality Modeling in Agricultural and Urban Watersheds
Two studies were conducted to integrate: 1) an agricultural nonpoint source pollution model, AGNPS, with Geographic Information System (GIS) databases, digital elevation model (DEM) data,...
Probabilistic Aspects of Hydroproject Maintenance
A survey of operation and maintenance personnel in the hydraulic structures sector was conducted to learn about the present maintenance approach and the perception of the probabilistic...
Uncertainty Quantification in Water Distribution Parameter Estimation
Calibration for water distribution system model parameters is usually undertaken with a minimal amount of field measurements so additional pseudomeasurements are assumed. Both the actual...
Diffuser Design for Water Quality-Based Toxics Control
U.S. Environmental Protection Agency regulations require that the discharge of toxic pollutants to the waters of the United States be controlled. These regulatory requirements have made...
Measurements to Calibrate Suspended Sediment Model for Adsorbed Contaminant Transport Study of North Fork Holston River, Virginia
A daily suspended sediment (SS) and mercury transport model was developed for a 25-mile reach of the North Fork Holston River below Saltville, Virginia. Daily streamflow measurements;...
Conventional Storm Drainage Which Recharges the Groundwater
Since the demand for water is on the rise, more resourceful means of retaining and controlling the release of stormwater is needed. This retained stormwater may then be used for aesthetic...
Routing for Lake and Tidal Canal Drainage System
A routing method is presented for lake and tidal canal interconnected drainage system in coastal urban areas. Combing reservoir routing, channel routing, and discharge computation of the...
Management of Water Resources Distribution in Iran
On the basis of 45th principle of the Iranian Constitution, seawater as well as river waters, streams and any other natural course, whether surface or underground, also floods, wastewaters,...
Maintenance of Stormwater Management Facilities: Neglects in Practice
The Stormwater Management Facilities (SWMF) have become a required component of urban development projects in many parts of the country. In spite of differences in size, type, and physical...
Effect of Manning's Roughness Coefficient in Simulating Flow Parameters in Natural Channels
Manning's roughness coefficients are presented for three of the oldest and largest irrigation canals in Egypt. The discharges ranges from 35 to 318 m3/s....
Numerical Modeling of Proposed Channel Designs (J. F. Baldwin III), California
Ship simulator studies of proposed improvements to navigable waterways are a very important part of any assessment. The John F. Baldwin Channel (JFB) Project (Phase III) is a ship channel...
Temporary Facilities?Making It Happen, Organization and Logistics
As construction projects become larger, more complex and are constructed both faster and under more adverse conditions--the use of temporary facilities is more prevalent. Temporary facilities...
CPM Techniques for Claims Avoidance and Preparation
Virtually all major construction claims consist of some aspects of delay, disruption or acceleration. Since all of the foregoing relate directly to the timing and sequencing of the project...
Planning and Organization to Control Liabilities and Insurance Cost
The liabilities and insurance cost associated with construction projects can be considerable. Activities that are performed which carry extensive liability exposures with limited controls...
Legal Principles and Theories
Legal issues are intertwined with all aspects of the technical considerations relating to temporary structures. This paper presents an introduction to the legal theories which relate to...
Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...
Return to search