Transmission Tower Foundations in Weathered Rock
A case history is presented which discusses the siting, design and construction of the tower foundations for a transmission line in southwest Alaska. The project, completed in 1983, consists...
New Cables for Old
In an eingineering first, the main suspension cables will be replaced on New York City's Williamsburg Bridge without closing it to traffic at any time. According to the design...
Hurricane Alicia
One Year Later
In the pre-dawn hours of August 28, 2983, Hurricane Alicia ripped its way ashore at the western tip of Galveston Island and moved northward to the Greater Houston area. This storm caused...
Composite and Mixed Construction
Steel and reinforced concrete are frequently combined in composite or mixed structural systems. This combination generally results isn greater economy and safety than could be achieved...
Coastal Zone '85
Coastal Zone '85 was a multidisciplinary conference for professionals, interested citizens, and decision-makers to exchange information and views. Coastal zone management...
Control of the Design Process
Gilbert/Commonwealth, Inc. (G/C) was the architect-engineer for the original design of the Florida Power Corporation (FPC) Crystal River Nuclear Plant, Unit 3 (CR3) and has been involved...
New Exchequer Dam, California
New Exchequer Dam design, in 1963, was in the transition period in which dumped rockfill was being recognized as having undesirable settlement characteristics, and compaction of rockfill...
Weak Rock in Two Rockfill Dams
Two South Australian concrete face compacted rockfill dams, built from soft rock won from each dam site, have performed successfully in service with only small leakage and settlements...
The Outardes 2 Concrete-Faced Rockfill Dam
The main dam of the Outardes 2 development consists of a rockfill embankment, built against an old water-retaining structure, and faced with an upstream concrete membrane. The interface...
Foz do Areia Dam?Design, Construction, and Behaviour
The 525 ft (160 m) high Foz do Areia dam in the Iguacu River, Parana, Brazil, built by 'Companhia Paranaense de Energia - COPEL', between 1975-1980, is part of...
Design and Performance of Shiroro Rockfill Dam
Shiroro Dam, constructed across the Kaduna River in Nigeria, is a rockfill dam with reinforced concrete facing. The dam was completed in late 1983, and reservoir impounding started in...
Design Features of Salvajina Dam
Salvajina dam is the second highest concrete face rockfill dam currently in service in the world. The characteristics of the foundation of the toe slab vary from fresh, sound and little...
Construction and Performance of Salvajina Dam
Salvajina Dam was constructed between July, 1982 and November, 1984. Relevant construction aspects are described, particularly those related with procedures and statistical data of the...
Khao Laem?A Concrete Face Rockfill Dam on Karst
A continuously reinforced concrete faced rockfill dam has been successfully designed and constructed on a karstic limestone foundation in Central West Thailand. The dam is not in an earthquake...
Design and Construction of Terror Lake Dam
Terror Lake Dam is a central feature of the 189 million Terror Lake Hydroelectric Project, located on Kodiak Island Alaska. The dam is a 193-feet (59 m) high concrete-faced zoned rockfill...
Kotmale Dam and Observations on CFRD
A concrete faced rockfill dam was the type selected for the 300 ft (90 m) dam at Kotmale in Sri Lanka for reasons of economy and speed in construction. Standard design concepts were tailored...
Design of Concrete-Faced Rockfill Dams
Design principles adopted in 1966 by the Hydro-Electric Commission have been applied to nine concrete-faced rockfill dams and remain substantially unchanged. Experience shows that the...
Seismic Design of Concrete Faced Rockfill Dams
The results of analytical studies of the stability of the slopes of concrete-faced rockfill dams under different levels of earthquake shaking are presented and used to propose desirable...
Seismic Analysis of Concrete Face Rockfill Dams
In this article, the observed behavior of existing rockfill dams during earthquakes is compared with published data regarding the estimated seismic performance of several recently designed...
Design and Stability Evaluation of Balsam Meadow Dam
The proposed Balsam Meadow Dam is a 126 feet high concrete-faced rolled rockfill dam currently under construction for the Balsam Meadow hydroelectric project in California. Detailed field...