Using an Index Stream to Make Instream Flow Decisions
The paper discusses development of an Integrated Operating Plan (IOP) that uses an unregulated (natural) stream in the upper Cedar basin as an index of overall hydrologic status of the...

Reservoir Reevaluation in TVA
Demands for the use of dams and reservoirs tend to change after the projects are completed. The Tennessee Valley Authority (TVA) works with State and local groups to try to increase the...

Estimating Earthquake Hazard of Municipal Water Systems
This paper uses the City of Memphis as a case study to present the seismic hazard evaluation of a municipal water delivery system. The horizontal peak bedrock accelerations resulting from...

Effects & Risk Analysis for Time Variable Exposures
The effects of toxicants on organisms in natural settings are a function of both the variations in exposure concentrations and duration of exposure. This paper present analysis procedures...

Water Measurement and Accounting of Lake Michigan Diversion
The diversion of water from Lake Michigan and the Lake Michigan Basin into the Mississippi River Basin has been regulated since the turn of the century. The U.S. Supreme Court Decree of...

Measuring Benefits of Water Supply Projects
Various approaches are used to determine the value of water supply projects. Deterministic methods will lead to biased valuation of additional supplies of water. Calculation of risk premium...

Contracting Provisions to Delay Capital Expenditures and Extend the Use of Available Water Supplies
A contractual means has been established of assuring equitable use of available water supply by the regional participants in the Williamson County Raw Water Line Project. A contract between...

Design of Sampling Networks for Water Table Monitoring
In the application to the monitoring of water tables the presence of temporal and spatial dependence is of crucial importance. Often the network will be used to collect data to estimate...

Instream Habitat Considering Hydro-Peaking
Hydroelectric projects with storage have the characteristic of being able to generate electricity with short notice and to stop generating electricity with equally short notice. This peaking...

Modeling Volatile Organic Transport with Vapor Sorption
A flexible finite element simulation model is developed to predict the movement of volatile organic compounds in variably saturated subsurface regions. The model incorporates both the...

An Economic Evaluation of Property Rights to Groundwater Resources in the State of Texas
The objective of this paper is to evaluate the basis for determination of property rights to groundwater in Texas, and to consider the implications of existing groundwater legislation...

A Comparison of Two Reservoir Projects and Associated Fisheries Impacts
The evaluation of environmental impacts is a critical component of reservoir project development. Impacts to fisheries are especially significant because of the extensive alteration to...

Hueco Bolson Recharge Demonstration Project
The Hueco Bolson Recharge Project in El Paso, Texas, is a unique recharge system, being a full-scale program in operation for 5 years in which municipal sewage is treated to potable quality...

Conjunctive Management of the Edwards Aquifer and Connected Surface Streams in South Central Texas
The Edwards Aquifer is a long, narrow conduit through which water moves underground across parts of South Central Texas. Increased use of water from the Edwards Aquifer has been substantial...

Managing an Interruptible Water Supply
The Lower Colorado River Authority has developed a plan for the management of an interruptible water supply for demands which do not require a firm commitment of specific amounts of water....

Corps of Engineers Drought Contingency Plans in Texas
The Corps of Engineers, Fort Worth District, is currently preparing Drought Contingency Plans (DCP) for the river basins and its projects. These plans will be incorporated into the master...

Benefits from Floodplain Management Activities in Relation to Operating South Holston Dam
Floodplain management activities have primarily been directed toward avoiding floodplain siting where practical; where siting is unavoidable, elevating structures, facilities, or equipment...

Review of the Design, Construction, and Operation of the Lake Carolyn Flood Control Pump Station
A review of the design, construction, and initial operation of the Lake Carolyn Flood Control Pump Station in Irving, Texas is presented. Staged water resource development design concepts...

Government Cooperation in Water Resources Planning and Management
The California State Legislators have shown real concern in trying to do something about the clearly identified water shortage. Many bills and funding programs have been proposed to encourage...

Streamflow Prediction and Allocation Model in Texas
The State of Texas' Water Rights Adjudication Act of 1967 provided for the creation of regional watermasters to divide the water of state streams in accordance with the adjudicated...

 

 

 

 

Return to search