Ferroresonance & the Snettisham Hydroelectric Project
Key system features of the Snettisham power plant in Alaska will be highlighted along with a discussion of the operational problems encountered due to a ferroresonant condition. The project...

Voltage Regulator Influence on Generator System Stability
During initial startup of a generator system, it is not uncommon to witness generator voltage instability. Most of the time, the solution is reduced to returning the stability control...

Dam Safety Hydrologic and Seismic Evaluation of TVA'S Beech Dam
Beech Dam is part of the Beech River watershed resource development located in Decatur and Henderson counties in west Tennessee. The development consists of eight dams and approximately...

Sungai Piah Hydroelectric Project (Malaysia)
The Sungai Piah Hydroelectric Project is located in the State of Perak in Peninsular Malaysia. It is a run-of-river project on steep mountain streams in dense tropical jungle. Nine intakes,...

Satellite Imagery Refines PMF Determination
This paper focuses on electromagnetic energy sensors, and describes how they are being used to determine the Probable Maximum Flood (PMF) for a drainage basin in Michigan. Remote sensing...

Utilizing Wetlands for Stormwater Retention
The design steps an engineer uses to develop natural wetlands to provide flood control while continuing to retain their natural functions will be analyzed. This paper will include a discussion...

Implications of the 1987-1990 Droughts for Hydropower Generation at Reclamation Powerplants
Droughts in the western United States beginning in 1987 have caused water supply shortages and required rationing of water in some areas. The reductions in water supply have also impacted...

Assessment of Changes at Glen Canyon Dam
This paper describes the complexity associated with the assessment of financial impacts of proposed and actual short-term restrictions at Glen Canyon Dam. The reasons for these restrictions...

Columbia River System Operation Review
For many years hydroelectric power has been a surplus commodity in the Pacific Northwest. However, this picture has been changing rapidly in recent years. Increasing pressures for use...

An Improved Incremental Economic Dispatch Method for Hydroelectric Generators with Nonconvex Energy Production Cost Curves
The Bureau of Reclamation (Reclamation) has undertaken a program to improve water resource management at its hydroelectric powerplants. One feature of the resource optimization program...

Development of the Collett Reservoir Addition to the Muck Valley Hydroelectric Project
The existing 26 MW Muck Valley Hydroelectric Project is located on the Pit River, 90 miles east of Redding in Northastern California. The Project was licensed by the Federal Energy Regulatory...

Case Study: Steele Creek Dam Safety Analysis, Bristol, Tennessee
Steele Creek Dam creates a small recreational park lake before discharging into Beaver Creek a few hundred yards below the dam. Existing homes and trailers downstream from this junction...

Risk Analysis Applications for Dam Safety
Dam safety modifications are intended either to reduce the likelihood of the adverse consequences of dam failure or the magnitude of adverse consequences. For instance, widening a spillway...

Bishop Intake #2 Spillway Modifications: A Case History
This paper covers the history of the events leading to the modification of Southern California Edison's (SCE) Bishop Intake 2 to pass a site specific design flood. From the...

Unique Design Used for Collapsible Gate
The collapsible gate on the Wausau Dam is unique; there is only one known that is similar in design. The collapsible gate, which looks like an inverted V, was designed by Mead and Hunt...

Raising of King Talal Dam
The King Talal Project is located on the Zarqa River, a Jordan River tributary, in Jordan. An existing embankment dam, 100 m high, built in the mid-seventies by the Jordan Valley Authority...

Avoiding Vibration in Penstocks
One objective of this paper is to indicate the potential sources of pressure pulsations within a hydraulic conduit system and the range of forcing frequencies associated with these sources....

Penstock Rehabilitation
The deterioration of aging penstocks is a common problem at many existing hydroelectric plants. A comprehensive understanding of the physical condition and functional limitations of an...

Rocky Mountain Project?Overview
The Rocky Mountain Project, in Northwest Georgia, will be a three unit hydroelectric pumped-storage project with 850,000 kW installed in an above ground powerhouse. The gross water volumes...

Hydraulic Model Studies?Pak Mun Hydroelectric Project (Thailand)
The paper presents briefly the hydraulic problems related to the project which were successfully solved by the 1 to 100 scale hydraulic model study carried out at the Asian Institute of...

 

 

 

 