Schoharie Creek Bridge Model Study
On April 5, 1987, a major storm occurred in the Schoharie Creek watershed and the resulting flood caused the bridge to fail. The hydraulic model of the bridge was performed to simulate...

Hydrodynamic Modeling of Shallow Lagoons and Lakes
There exist many shallow lagoons and lakes in Florida. With an average depth of 3 meters or less, circulation and transport within these water bodies are significantly influenced by the...

An Approach for Modeling the Upper Chesapeake Bay
To resolve the bay geometry with a minimum number of grid points, boundary-fitted coordinates are employed. A major question is how to prescribe tidal boundary conditions at the Bay Bridge...

Microcomputer Capability: Practitioners' Perspective
Leading practitioners in the water resources engineering field want new graduates who are well grounded in fundamentals and are computer literate. The needs of leading practitioners are...

Federal Microcomputer Software for Urban Hydrology
The purpose of this paper is to describe the development, availability, and general use of selected urban hydrology microcomputer software developed by: U.S. Soil Conservation Service...

Importance of Density Gradient Terms in Estuaries
In estuaries classified as well-mixed or unstratified, two-dimensional depth averaged models have often been applied with the density considered as constant. Calculations, based on measured...

Flow and Quality Simulation of a Proposed Marina Development
A proposed off-channel marina development on the Sacramento River in California requires landfill in an area that is currently within the flood plain. Two dimensional computer models for...

U.S. Army Corps of Engineers Sedimentation Engineer Manual A. Overview
Until the 1970's, sediment analyses within the Corps of Engineers were mostly confined to estimates of the reservoir sediment storage needed, for the life of the project....

Corps of Engineers EM 1110-2-4000 Chapter 3?Sediment Yield
This paper overviews the chapter on sediment yield, one of the three technical chapters of this new design manual. Corps methods to determine sediment yield primarily feature the use of...

River Sedimentation
This paper discusses Chapter 4 of the U.S. Army Corps of Engineers Engineer Manual of Sedimentation Engineering. The chapter identifies potential river sedimentation problems, associates...

U.S. Army Corps of Engineers Sedimentation Engineering Manual D. Reservoir Sedimentation
This paper discusses Chapter 5, Reservoir Sedimentation, of the U.S. Army Corps of Engineers' Engineering Manual (EM) on Sedimentation Engineering, EM 1110-2-4000. The chapter...

Predicting Channel Recovery from Sand and Gravel Extraction in the Naugatuck River and Adjacent Floodplain
Gravel extraction at five sites along the Naugatuck River in Connecticut is of sufficient magnitude that channel recovery to pre-mining morphology is expected to require up to several...

Monitoring Water Quality: Neches Estuary, Texas
A continuous monitoring project has been established in the Neches Estuary of Southeast Texas, for the purpose of investigating the influence of tidal hydraulic on sedimentation in a floating...

Twenty Years of Experience in Unsteady Flow Modeling of Open Channels at TVA
Two concerns prompted the development of dynamic methods for flow routings: (a) the safety of the nuclear plants being planned along the Tennessee River in the 1960's and...

Morphologic and Hydraulic Adjustments of Red River from Shreveport, LA to Fulton, AK, between 1886 and 1980
Morphometric data (channel width and depth and slope) from 4 hydrographic surveys of Red River (1886, 1938, 1968, 1980) from Shreveport to Fulton and specific-gage analyses for the gages...

Modeling of a Low Head Hydroelectric Project
In order to shorten the time to develop a hydroelectric project at the Corps of Engineers Hannibal Lock and Dam on the Ohio River for the City of New Martinsville, West Virginia, a turnkey...

Channel Response to SCS Type-C Grade-Control Structures on Burney Branch, Mississippi
Five SCS Type-C grade-control structures were installed in Burney Branch in 1980 to remove 59.4 feet (18.1 m) of grade. The performance of the structures was evaluated in 1984 after they...

Summary of Floods and Droughts in the United States
This paper describes a current national analysis of streamflow data being conducted by the U.S. Geological Survey to identify and map, in a consistent State-by-State format, the frequency...

Potential Effects of Global Climatic Change on the Tennessee Valley Authority Reservoir System
Rising concentrations of carbon dioxide (CO2) and other 'greenhouse' gases are likely to increase global temperatures and...

Rainfall Intensity-Duration Equations
A method for rapidly developing a rainfall intensity-duration equation for durations less than one hour and recurrence intervals between 2 and 100 years for any location in the conterminous...

 

 

 

 

Return to search