The Role of Social Sciences in Putting People Into Federal Water Resources Project Planning and Evaluation
While great attention has been given to the importance of engineering, economic, and, recently, environmental factors, the need for consideration of the social impacts of projects and...
The Role of Water Marketing in Water Allocation: A Case Study
The paper covers in some detail a specific example of water allocation, the El Paso, Texas area, to analyze what appears to be a good opportunity for successful application of water marketing,...
Application of Social Science Research Products in Urban Water Resources Planning
Phoenix was spurred to action in 1981 because of the projected depletion of one of its surface water supplies by the summer of 1982. In addressing the projected near-term crisis, it quickly...
The Development of Metropolitan Water Markets: Seattle, Washington 1887-1987
This paper applies the case-study approach to examine the development of metropolitan water markets and its implications for central city and suburban water districts. The greater Seattle,...
Design of an Alluvial Channel Relocation in an Urban Environment
The relocation of a three-mile (4.8 km) reach of the Salt River channel in metropolitan Phoenix, Arizona is reviewed. The methods used for hydraulic analysis of this dynamic alluvial channel...
Stable and Environmental Channel Design
The Wildcat and San Pablo Creeks Flood Control Project is located in Richmond, California. Both streams flow through a highly urbanized area, periodically overflowing their banks and causing...
Computer Aided Hydraulic Design of Open Channels
Over a 10 year period, the computer program, WASURO, was developed by the U.S. Army Corps of Engineers District, Los Angeles (LAD), which utilized many of the criteria of the previously...
Pinto Wash Alluvial Fan Litigation
This paper presents a case history involving flood/damage litigation brought by a downstream farmer against an upstream farmer and a local public irrigation district. The case combined...
Southwestern Drainage Litigation
In this paper, three technical sources of drainage litigation are examined. First, in the overall sparsely but locally densely populated Southwest, there is a severe lack of precipitation...
Flow Measurement Using a Digital Pressure-Time Method
This paper describes flow measurements performed by TVA's Engineering Laboratory as a part of absolute efficiency measurements of the two units at the Great Falls Hydro Plant....
Instrumentation for a Dry-Pond Detention Study
A 12.3-acre, fully urbanized, residential land-use catchment was instrumented by the U. S. Geological Survey in Topeka, Kansas. Hydraulic instrumentation for flow measurement includes...
The Changing Role of the U.S. Bureau of Reclamation
The Bureau's reorganization will enable it to more effectively and efficiently meet changing water resources needs in the western states. The new role of the Bureau is particularly...
Geotechnical and Hydraulic Stability Numbers for Channel Rehabilitation: Part II, Application
Stability numbers for bank stability (Ng) and bed stability (Nh) have been developed. Optimum placement of...
Riverbank Instability Due to Bed Degradation
Degradation lowers the bed of an alluvial channel over a long reach. This has the effect of increasing the bank heights and angles, which decreases the stability of the banks with respect...
Stratigraphy of Alluvial Fan Flood Deposits
The purpose of this paper is to describe an engineering geologic technique for assessing the frequency and magnitude of sedimentation events on alluvial fans. The technique is based on...
Design Depths and Velocities on Alluvial Fans
Under Federal Emergency Management Agency (FEMA) guidelines, flood depths and velocities on alluvial fans are determined by considering the probability of a given point on the alluvial...
Evaluating Flood Hazards on Alluvial Fans
In 1982, the Federal Emergency Management Agency (FEMA) developed a methodology for the determination of flood hazard zones and base (100-year) flood elevations on alluvial fans for administering...
Design and Evaluation of Storm Water Detention Facilities Using a Design Storm and Probable Maximum Storm
When designing a storm water detention facility, both a design storm (DS) and a probable maximum storm (PMS) should be considered. The DS is used to design the facility. The PMS is used...
An Inline Retarding Basin
This paper discusses the idea of retarding flows within existing right-of-way in a linear basin. This concept is based on longitudinally dividing the right-of-way into two sections. The...
Scodie Canyon Flash Floods of 1984
This paper describes a unique thunderstorm and flood which occurred in Kern County, California in 1984. It describes the follow-up studies and method of implementation of building restrictions...
Return to search