Reshaping Breakwaters on the Stability of Roundheads and Trunk Erosion in Oblique Waves
The stability of a berm type breakwater (sacrificial breakwater) was tested in a 3-dimensional model at The Hydraulics laboratory, Department of Civil Engineering, University of Aalborg....
Hydraulic Performance of Berm Breakwaters
In recent years, the concept of unconventional rubble mound breakwaters, i.e berm breakwaters, has gained much attention among researchers and engineers as an economical method to build...
Application of Computational Model on Berm Breakwater Design
The development of a computational model on dynamic stability is summarized. The model is able to predict profiles of slopes with an arbitrary shape under varying wave conditions. The...
Experimental and Historical Verification of the Performance of Naturlly Armouring Breakwaters
A series of hydraulic model test were carried out to investigate the mechanism by which naturally armoring breakwaters, that is breakwaters in which the initial profile is adjusted into...
The Development of a Design for a Breakwater at Keflavik, Iceland
A breakwater design was developed to be built using local quarried rock and relatively simple construction methods. The design significant wave height was 5.8 and the maximum depth of...
The Design and Construction of a Mass Armoured Breakwater at Hay Point, Australia
The design and construction of a prototype mass armored breakwater is briefly described. The paper also explores the practicality of allowing the progressive interaction of design, physical...
Performance of a Berm Roundhead in the St. George Breakwater System
A new harbor under construction on St. George Island in Alaska's Bering Sea is using the berm breakwater concept for protection from wave attack. Three breakwaters are included...
Implementation and Performance of Berm Breakwater Design at Racine, WI
A large berm-type breakwater has been constructed at the entrance to Racine Harbor, Wisconsin, on the western shore of Lake Michigan. The breakwater is approximately 450 feet long, in...
Berm Type Armor Protection for a Runway Extension at Unalaska, Alaska
A proposed runway extension located on the Aleutian islands was designed to withstand forces of Bering Sea storm generated waves using a unique armor protection concept. The proposed runway...
Unconventional Rubble-Mound Breakwaters?Concerns
A Seminar on Unconventional Rubble-Mound Breakwaters was held in Ottawa, Canada, on the 15th and 16th of September 1987. This paper is an attempt to summarize the general discussion that...
Computing in Civil Engineering
Microcomputers to Supercomputers
This book contains papers presented at the Fifth Conference on Computing in Civil Engineering. Computer applications in specific disciplines are covered. These include construction engineering...
Building Code Requirements for Masonry Structures and Specifications for Masonry Structures
The proposed Building Code Requirements and Specifications for Masonry Structures presented in this book were developed by the Joint American Concrete Institute, American Society of Civil...
Rolling Incinerators
The Illinois Environmental Protection Agency (IEPA) is using a mobile incinerator to clean up a former oil and solvent storage/transfer operation which was badly contaminated. The benefits...
Biological Treatment of Hazardous Wastes
Biological treatment�using nature's bacteria and fungi�sometimes costs as little as 10-20% as incineration. Wastes in any form�solid, aqueous and gaseous�can be treated biologically....
Drawing up Waterproof Curtains
Curtain wall damage has recently become the number one source of building owner complaints. Until wall systems are designed with backup water collection systems and other details, leakage...
The `Down' of Top Down
The 800-space parking area for the Milwaukee Center was built in a four story deep basement of the building. In order to excavate the area without damaging two adjacent historic structures,...
High Strength High Rise
For the sixth time in history, a structure billed as the world's tallest concrete building (over 950 ft) is under construction in Chicago. The contractors describe the structure...
Building the Seven Seas
The Brookfield Zoo's Seven Seas Complex, outside of Chicago, is a combination of the Caribbean and the Pacific Northwest. Completed in May 1987, the Seven Seas Complex consists...
Dilatometers Settle In
The benefits of the dilatometer test DMT are described. This geotechnical in situ testing tool was developed and patented by an Italian professor and engineer named Silvano Marchetti....
U.S. Embassy In Moscow: A Structural Stalemate
The fate of the nearly finished American embassy in Moscow should be decided by next fall. In the meantime, it stands empty. On April 15, 1987, Congress made public a National Bureau of...
Return to search