Innovative Design for Diversion
A conventional diversion scheme to facilitate construction of the 120 m high rockfill dam for the Beni Haroun project in Algeria would have required three 10 m diameter diversion tunnels....

Rocky Mountain Project Power Tunnel Filling Test
The Rocky Mountain Project, a pumped storage development located in NW Georgia, is owned jointly by Oglethorpe Power Corporation and Georgia Power Company. Initial construction included...

Sungai Piah Hydroelectric Project (Malaysia)
The Sungai Piah Hydroelectric Project is located in the State of Perak in Peninsular Malaysia. It is a run-of-river project on steep mountain streams in dense tropical jungle. Nine intakes,...

Hydraulic Aspects of West Delaware Tunnel Hydroelectric Development
Construction of a 7,500 kilowatt hydroelectric plant at the end of a 70 kilometer long water supply tunnel posed unusual hydraulic conditions that needed special consideration. Cooperation...

UCD Drag Plate Lysimeter?Momentum and Mass Transfers
The second large (6.1 m dia., 0.97 m deep) lysimeter built at the University of California, Davis (UCD) was largely the brainchild of Dr. F.A. Brooks, the initial Project leader of a U.S....

Transpiration by Douglas Fir Using Lysimeters
During the spring of 1971 a 28 m Douglas fir tree was installed in a weighing lysimeter. Some details of construction are presented. The weighing mechanism consisted of eleven lengths...

Discharge Forecast of Underground Tunnel System
An underground tunnel system can be discribed with linear system theory and its mathematical model can be made up according to its recharge and discharge conditions. But, because of so...

Winds, and Their Effects on Tides, in San Francisco Bay
Many leveed areas adjacent to San Francisco Bay are potentially subject to tidal flooding. In response to this concern, Congress authorized the U.S. Army Corps of Engineers to conduct...

Wind Generated Wave Resuspension of Sediment in Old Tampa Bay, Florida
Vertical profiles of velocity and suspended-solids concentration were measured at a scientific instrumentation platform in Old Tampa Bay during the passage of a cold front in March 1990....

Three-Dimensional Modeling of Transport of Fine Sediments and Contaminants in Lakes and Estuaries
The transport of fine sediments and contaminants due to currents and wind waves in estuaries and lakes have been studied by means of field experiment, laboratory experiment and a comprehensive...

Fluid Mud Problems in Lakes, Reservoirs and Detention Ponds
An experimental study of wind induced surfacing of fluid mud bottoms in shallow water has been conducted. The experiments involved a channel placed within a wind tunnel, where a two-layered,...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Project Controls on the Channel Tunnel Project
Establishing controls for a multi-facted, multi-billion dollar, privately financed, project which is run by two organisations created solely for that one project has been a major challenge....

Computer-Based Environment for Integrated Tunneling Design and Construction
The MIT tunneling group has developed, over the past decade, a number of decision support tools for the geologist and engineer, planner and designer, owner and contractor involved in tunnel...

Introduction to Immersed Tube Tunneling Symposium
Today's Symposium on Immersed Tube Tunneling is a continuation of a series of papers that began at Construction Congress '89 with discussion of mined tunnel subaqueous...

Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....

Seismic Design Issues for Immersed Tube Tunnels
This paper provides an overview of the issues and the state of the art techniques in the seismic design of immersed tube tunnels (ITT). Particular focus is given to the ITT presently planned...

Immersed Tube Tunnel, Boston, Massachusetts
A four-lane Immersed Tube Tunnel is planned for the crossing of Boston Harbor from the City of Boston to the Logan Airport area in East Boston. The immersed tube consists of 12 sections...

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

Hurricane Hugo One Year Later