Waterpower '91
A New View of Hydro Resources
This proceedings, Waterpower '91: a New View of Hydro Resources, consists of papers presented at WATERPOWER '91 Conference...

Avoiding Defective Specifications
Despite everyone's best efforts, the design intent as portrayed in the contract documents is rarely crystal clear. As a result, the owner and the project team often find themselves...

Ground-Water Modeling Without Fear
Computerized ground-water modeling has leapt from the cloistered laboratory to the field project as more and more programs are written for the personal computer. These easy-to-understand...

Kuwait: The Incredible Shrinking Rehab
With rehabilitation estimates now just 20% of what they first were, the liberation of Kuwait has not been a cure-all for the construction industry. Firms participating in the emergency...

Update: Bridge Scour
Nearly 500 bridges have failed because of hydraulic conditions�primarily scour�since 1950, but the collapse of the Route 90 bridge over Schoharie Creek in April 1987 focused national attention...

Rehabbing the U.S.
When it comes to protecting its $1.4 trillion investment in public-works infrastructure, the U.S. has been like a homeowner who puts off fixing a leak until the ceiling lands on his head....

Foundation Studies in a Fault Zone and a Steep Valley Slope
This paper presents two case histories which illustrate unique problems in defining the character of rock for support of structures. The first case study concerns a conventional building...

Determination and Presentation of Subsurface Conditions for Design and Construction
A major problem in the design and construction of many engineering projects is the lack of adequate geotechnical information both for design and for determining conditions to be encountered...

Regional Water Supply Needs and Sources, Southwest Florida Water Management District
In 1990, the Southwest Florida Water Management District completed a district-wide water supply needs and sources planning analysis. The SWFWMD needs and sources analysis identifies water...

Yampa River Basin Alternatives Feasibility Study an Example of Conflict Resolution in Water Supply Development
The Yampa River, located in northwest Colorado, is a major tributary of the Green River segment of the Colorado River system. Potential water resource development in the Yampa River Basin...

Yazoo River Basin a New Direction for the Corps
The paper presents the lessons learned from the past events in the Yazoo Basin. The Yazoo Basin project is the only mechanism available that can provide the flood control that is needed...

Restructuring of Water Agencies in Salt Lake Valley, Utah
The Salt Lake Valley consists of a metropolitan area with a population of about one million. Wholesale domestic water supply is provided to this area by two main agencies, namely Salt...

Tampa Bay: A Collaborative Approach to Effective Watershed Management
Rapid urbanization in the Tampa Bay watershed continues to challenge Florida's surface water management efforts. Upgrading of all wastewater treatment facilities substantially...

Construction under Fire
Construction is not carried out in a laboratory setting under controlled conditions�especially in areas of socio-political conflict, such as El Salvador in the 1980s. Instead, the construction...

Double-Decking the Freeways
Elevated highways cost more than at-grade construction. Nonetheless, the hidden costs of increased traffic congestion and the real cost of urban right-of-way make elevated highways feasible....

The Structural Curtain
Curtain walls are not standard off-the-shelf items. For major projects, they are almost always custom-designed. Typically, curtain walls are on the critical path of project and often account...

Ultimate Air Rights
The new 1 million sq ft office tower at 450 Lexington Ave. rises from available space between commuter railroad tracks, through the center of a renovated four-story post office and up...

Structural Aesthetics
When the design and construction of a building was the responsibility of a single individual, interaction between the aesthetics of architecture and the demands of structure did not exist...

GIS Plans Wastewater Future
When the Public Works Department began phase 3 construction on Albuquerque, N.M.'s current wastewater treatment plant in 1990, it was time to begin thinking about the next...

Engineering Women Into the Workplace
According to the U.S. Department of Labor, by the year 2000, only 15% of the work force will be white men; 64% will be women of mixed ethnic backgrounds. Clearly, statistics show that...

 

 

 

 

Return to search