Commercial Launch Facility Economic factors
Launch facility construction, maintenance and modification costs remain a largely invisible part of the cost of putting mass into orbit. The government can lease launch facilities to commercial...
Considerations for the Development of a Commercial Spaceport
Several states and countries are currently reviewing the feasibility of developing a commercial spaceport in their homeland. United Engineers & Constructors Inc. completed an extensive...
Columbus Generic Element Management Concept
The concept for largely autonomous onboard management of the ESA Columbus project elements relies on the automation of operational procedures. Reconfigurable items are commanded in sequence...
Normal Accidents and Logistics in Space Operations
Unpredictable systemic accidents, normal accidents, will occur in highly-complex large-scale space systems. To mitigate the catastrophic consequences of normal accidents, containment engineering...
Challenges and Opportunities in the '90s and Beyond?A U.S. Army Corps of Engineer's Perspective
In the foreseeable future, water resources expenditures will probably be dominated by environmental/water quality concerns. Strong focus is coming to bear on the state of repair, rehabilitation...
Planning Model for Sewer System Rehabilitation
A probabilistic model is developed to simulate long-term variation in the structural condition of wastewater collection systems. The effects of both deterioration and rehabilitation can...
Creatively Cost Sharing a Large Flood Control Dam
The passage of Public Law 99-662 in November of 1986, commonly known as the Water Resources Development Act of 1986, added a new dimension to Federal development of water resource projects....
Predicting Watermain Breakage Rates
Recent studies on water main breakage have shown significant spatial and temporal clustering in the breakage pattern. The methodology described in the paper provides the basis for a prediction...
Infrastructure Investment During a Boom/Bust Cycle
During a boom period, a utility can find itself in a position where the usual rules of thumb for making investment decisions are no longer trusted. If the utility enters the boom period...
Rehabilitation Model for Water Distribution Systems
This paper presents an optimization model for determining the minimum cost rehabilitation and replacement of pipes in water distribution systems. The advantages of the proposed model include...
Probabilistic Basis for Managing Maintenance
The paper discusses a procedure based on component failure probabilities, consequences of failure, and risk associated with loss of system. Aging effect of structures and equipment on...
Urban Drainage Pipe Systems: Failure Diagnosis and Rehabilitation Planning
A Task Committee on Failure Diagnosis and Rehabilitation of Urban Drainage Infrastructure has been organized by the Urban Water Resorces Committee of the Water Resourcs Planning and Management...
The New Generation of Pipeline Rehabilitation
The new advancements in pipelines reconstruction technologies now permit total sewer system rebuilding of collectors, drainlines, manholes, service laterals, and force mains without excavation....
Retrofitting a Regional Stormwater Facility
The City of Tacoma, Washington, constructed a regional stormwater detention facility in the Leach Creek watershed in 1961 to permit development in the southwest corner of the City while...
Rehabilitation of Rapidly Urbanizing Streams
DuPage County, Illinois is implementing a stream maintenance program with the purpose of restoring and preserving the hydraulic efficiency of its streams and drainageways. The program...
Recognizing Institutional Barriers in Regionalizing Water Supply Infrastructure
The Northern Colorado Water Conservancy District (District) is conducting a study to determine the feasibility of implementing expanded regional cooperation for future municipal and industrial...
Willingness to Pay for Stormwater Infrastructure
The contingent valuation method is used to estimate the willingness of Baltimore County homeowners to pay for stormwater controls to reduce nutrient loadings to the Chesapeake Bay. Homeowner...
Stormwater Management: Detention in Illinois
In 1987 the Illinois Department of Transportation contracted the Northeastern Illinois Planning Commission (NIPC) to perform a study to determine the effectiveness of the current accepted...
Managing Water During Drought
In response to the problems that recent droughts have exposed, the Corps of Engineers is conducting the National Water Management During Drought Study. The primary purpose of the study...
Utilization of Stormwater Runoff to Recharge Underlying Aquifer
Based on the available data and its proximity to the Capital area, Wadi Al Khawd was selected as the site of the first aquifer recharge project in Oman. The project was designed by Stanley...
Return to search