Technical pioneering by design-construct firms
U.S. industry leads the world, in good part because of our engineering creativity. Key partners in U.S. industrial innovation are design/construct firms that build many or most U.S. industrial...
The CRT Computer-Graphics Terminal: Indispensible Design-Aid for Some Structural Engineers
Putting the benefits of computer graphics within the cost reach of many consulting firms are: the development of low-cost ($3,000 to $10,000) storage-tube CRT graphics terminals; and the...
Yukon River to Prudhoe Bay Highway � Lessons in Arctic Design and Construction
Construction of roads on muskeg over perennially frozen subsoils is becoming increasingly common in the arctic and subarctic regions of North America due to recent emphasis on development...
World's Third Longest Cantilever Bridge
This report includes the planning, design and construction procedure of the world's third longest double deck, cantilever bridge, Osaka Port Bridge, which was completed in...
La Guardia Airport Parking and Terminal Frontage Structure
One of the world's largest parking structures, at New York City's La Guardia Airport, is of special interest because the structural steel has no fireproofing....
California Soon to Have Platform in 850 Ft of Water
Exxon's oil drilling and production platform, to be placed off Santa Barbara, Calif. next July, will stand in water twice as deep�� 850 ft versus about 420 ft�� as any other...
Paul Bunyan Among Offshore Steel Structures
The world's two largest drydocks, the larger 1,150 x 800 ft in plan were used to assemble on land the four steel jackets. They now stand in the North Sea in about 400-ft of...
New Jack-Up Drill Rig Extends Their Range Into 375-Ft Water Depth
A new design of jack-up drill now building for the Gulf of Mexico extends from 250 ft to 375 ft, the depth of water in which they operate. Until now what limited their depth was their...
Hydraulic Fill Dams/Earthquake Stability
The 1971 San Fernando earthquake near Los Angeles, Calif., generated concern for the stability of hydraulic fill dams. Two dams located near the fault were damaged severely. The shaking...
California Coastal Commission Accepts Advice from ASCE on Earthquake Design Controversy
A case history is described of an ASCE section (San Francisco) causing a public agency to change its position with respect to earthquake design criteria. The California Central Regional...
Today's Northwest Passage
The Lower Snake River Project received the outstanding water resources engineering project award for 1976 from ASCE. The lower 140-mile (225-km) reach of the Snake River from its mouth...
Olympic Construction for Olympic Games
Montreal is preparing at full speed for the Olympic Games. The precast, post-tensioned concrete velodrome will seat 10,000. It will be available for conventions, public meetings, exhibits,...
Birth of the Skyscraper
Before invention of the elevator, six stories was the practical limit to the height of a commercial building. Following the Chicago fire of 1871, building designers there were quick to...
Structural Failures and How to Prevent Them
Reducing failures of buildings and other structures requires compentent design; clear communication of that design to the contractor by means of engineering drawings, etc.; careful and...
Highway in Harmony with Its Environment
The Vail Pass portion of Interstate 70 in Colorado is developing into a masterpiece of modern highway; designed and built to blend into a scenic mountain environment. The consultant's...
Polyethylene Pipe Solutions to Sewer Outfalls
One of the primary concerns of the Chief of Naval Operations is to insure that environmental pollution standards are met in this country and abroad at those naval bases near oceans or...
New Era in Fire Protective Coatings for Steel
Building designers have been receptive to new approaches to fireproofing steel. Among alternatives to traditional fireproofing now on the market: (1)Medium density inorganic systems such...
Falsework Eliminated in Bridge Erection
The U.S. Highway 50 bridge just east of North Vernon, Ind., is one of the first applications in this country of the precast, prestressed concrete box girder design erected without falsework....
Plastic Tower Solves Radar Interference
A new nonmetallic tower section has been designed to eliminate major rador interference problems caused by a steel Radar Microwave Link tower. The replacement section is composed of a...
Structural Analysis and Design of Nuclear Plant Facilities
Draft Trial Use and Comment
This Manual of Engineering Practice in
Return to search