Routing for Lake and Tidal Canal Drainage System
A routing method is presented for lake and tidal canal interconnected drainage system in coastal urban areas. Combing reservoir routing, channel routing, and discharge computation of the...
Management of Water Resources Distribution in Iran
On the basis of 45th principle of the Iranian Constitution, seawater as well as river waters, streams and any other natural course, whether surface or underground, also floods, wastewaters,...
Detention Basin Design to Control Flood Volumes
A desk-top method is presented for hydraulic design of detention basins. The main objective is to control the flood volume rather than the peak discharge. The method is based on the pre-determined...
Effect of Manning's Roughness Coefficient in Simulating Flow Parameters in Natural Channels
Manning's roughness coefficients are presented for three of the oldest and largest irrigation canals in Egypt. The discharges ranges from 35 to 318 m3/s....
Temporary Facilities?Making It Happen, Organization and Logistics
As construction projects become larger, more complex and are constructed both faster and under more adverse conditions--the use of temporary facilities is more prevalent. Temporary facilities...
The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...
Legal Principles and Theories
Legal issues are intertwined with all aspects of the technical considerations relating to temporary structures. This paper presents an introduction to the legal theories which relate to...
Liability Insurance Coverages for Designers of Temporary Structures
A recent survey completed by the American Consulting Engineers Counsel (ACEC) indicates that in 1990 approximately 40 claims occurred per 100 firms. There also is an indication that claims...
Safety Analysis of Handset Wood Slab Formworks
A reliability index is calculated for flexural strength of a handset wood slab formwork system. Load and resistance models are based on a survey of construction loads and wood test data...
Limit States Design of Wooden Formwork for Concrete Walls
Load and resistance factors are developed for ultimate limit states design of wooden formwork components for concrete walls when the lateral concrete pressures are computed using the ACI...
Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....
Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...
Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...
Temporary Lateral Support System for Historic Building Facades in Boston
This paper describes a system of vertically cantilevered structural steel trusses, designed by the author, that provided temporary lateral support for a group of five and six story, 120...
Performance of a Prestressed Rigid Frame During Removal of Column 6W from I93 in Boston, Massachusetts
The first phase of the suppression of Boston's Central Artery included the Early Viaduct Construction in the Central Artery North Area. This project required that Column 6W...
Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...
Modular-Prestressed Shoring System for Demolition
Two case histories are used to present the development and performance of a modular prestressed vertical shoring system to control deflections of existing structures during the demolition...
Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...
Composite Twin Tub Bridge Erection Intersection of Interstate I-84 and I-94 in Hartford, Connecticut
Curved bridge erection requires detailed preparation by the contractor, plus a sharing of responsibility and liability between the owner, designer of the new structure and the contractor....
Construction Accident Analysis: The Inductive Learning Approach
This paper presents the use of inductive learning in the analysis of construction accidents. It provides a brief description of ROUGH, an inductive system based on the theory of rough...
Return to search