Dredging Contaminated Sediments: A Monitoring Plan for Boston Harbor
Dredging and blasting will be conducted in Boston's Inner Harbor over approximately a one-year period during construction of the Third Harbor Tunnel. The silty organic surface sediments...

Pier and Wharf for U.S. Navy Homeport, Everett
Design of the homeporting facilities at Everett, Washington, began in 1985. The U.S. Navy and the design team were faced with many challenges, including a waterfront site containing contaminated...

Evaluation of Proposed Port Facilities, Charleston Harbor, South Carolina
Often it is necessary for port facility designers to evaluate various alternative development plans for port facilities. These evaluations may include a ship navigability study or an evaluation...

Multiuser Sites for Contaminated Sediment Disposal
The Washington Department of Ecology (WDOE) recently adopted a program to identify, rank, and clean up contaminated sediment sites in Puget Sound. Site cleanup, in conjunction with dredging...

Rock Creek?Cresta Sediment Management Plan
Pacific Gas and Electric Company (PG&E), an investor owned utility serving northern and central California, is working to manage sediments at its Rock Creek - Cresta Hydroelectric...

Interpreting Dredge Material Bioassay Data?COBIAA
Two types of sediment bioassays may be conducted in the regulatory evaluation of dredged material, toxicity tests and bioaccumulation tests. COBIAA (for the Consequences of Bioaccumulation...

An Overview: Wetland Restoration, Protection, and Establishment by Beneficially Using Dredged Material
Dredged material has been used beneficially by mankind for many years; in the past two decades it has purposely been used to restore and protect existing wetlands, and to establish new...

A GIS Based Synthetic Watershed Sediment Routing Model
For most watersheds, extensive water quality data are not available. Land use, topographic, edaphic and meteorological information is generally available; but without extensive water quality...

BRASS Modeling of Lo?za Reservoir, Puerto Rico, for Sediment Management Operations
Loiza reservoir, the principal water supply for metropolitan San Juan, delivers 3.5 m3/s (80 mgd) to the Sergio Cuevas filter plant. Sedimentation...

The Potential Fate of Particulate Contaminants from the Rehabilitated Ranger Uranium Mine
In the initial period after rehabilitation of the Ranger Uranium Mine most particulate matter released into Magela Creek will be wash load. 10% of the annual deposits on the backwater...

Use of X-Ray Computed Tomography in the Study of Marine Sediments
X-ray computed tomography (CT scanning) is primarily a medical imaging technique. When applied to marine sediments, it responds predominately to the spatial density distribution within...

Old Problems and New Challenges in Marine Geotechnical Engineering
The discipline of marine geotechnical engineering originated nearly five decades ago, primarily as a result of the offshore oil and gas industry. As this industry moved into deeper waters,...

The Greening of Greens
Until recently, most consulting engineers thought golf courses were fun to design, good for the portfolio, but not worthy of much serious thought. Environmental issues and competing uses...

Predicting Sediment Loads
Many reservoirs in the U.S. and internationally have experienced unforeseen storage loss when sediment loads exceed those originally predicted during the design stage. This often results...

Sediment Impediment to Boat Launching at Miller Park, City of Avon Lake, Ohio
In 1987 a boat launching facility was constructed at Miller Park, in the City of Avon Lake, Lorain County, Ohio (Figure 1). There have been problems with sediment buildup ever since it...

Mississippi River Diversions for Marsh Creation
Large scale, uncontrolled sediment diversions from the Mississippi River are proposed by the Corps of Engineers as a means of creating new marsh and reducing the loss of wetlands. These...

A Decision Support System for Dredging the Lower Mississippi River
The paper describes a decision support system proposed to aid short-term scheduling of maintenance dredging activities on the lower Mississippi River for the New Orleans District of the...

Pilot Drywell Study Pierce County, Washington
Subsurface disposal of stormwater runoff is widely utilized in areas with permeable or porous soils, including the Clover/Chambers Creek (CCC) Basin in central Pierce County, Washington....

Evaluation of the Feasibility to Retrofit Stormwater Control Facilities to Improve Pollutant Removal Performance
This paper presents the results of an analysis that was performed to predict the efficiency of removal for suspended sediments in storm runoff under existing conditions and under several...

Dynamic Effect of Sediment on Dam Hydrodynamics
The dam-reservoir-foundation interaction problem has been studied by many investigators. A two dimensional model of compressible porous media is employed to analyze the dynamic response...

 

 

 

 

Return to search