Future Containerships from a Ship Owner's Viewpoint
This paper is a presentation of the author's projection of size and design constraints of future containerships. There is a discussion of containers and on-deck container...

Ports in Transition in the Developing World
Export led strategies have been proposed by the main financial institution as a way for these countries to emerge from the downturn. This policy relies heavily on foreign trade. Transportation,...

The Empty Berth: Problems in Developing Countries
The ports in developing countries have grown by leaps and bounds. Different causes (of market, technical, economic, financial or political) were the origin of that irregular growth, derived...

Pavement?An Integral Part of the Terminal as a Container Handling System
A modern container terminal requires extensive areas of paving for stacking and moving containers, the provision of which often proves to be one of the most expensive single items, in...

Berth 5-6 Pavement Performance: Port of Oaklan
In 1978 the Port of Oakland commenced a project to demolish the old Berth 5, 6 & 7 break bulk sheds, portions of the wharves, and the warehouses behind, and to construct container...

Construction Approaches to the Navy's Floating Pier Concept
The subject of this paper is a floating pier which is currently under evaluation as a more cost-effective solution for berthing Navy ships. This new approach to pier design was sponsored...

Master Plan for Rehabilitation, Modernization and Expansion of the Port of Suez
Rehabilitation and expansion of the Port of Suez, started in 1977, has been an ongoing process for the last eight years and is continuing. As a result of detailed planning of facility...

Gabon Mineral Port Master Plan?A Case History
The integrated design of infra-structure and superstructure of marine terminals for bulk cargoes presents opportunities for innovative solutions that can produce substantial economic benefits....

Financial Analysis of Port Facilities
This paper describes a spreadsheet-based structure for financial analysis of port facilities and services, designed for use as a planning tool by non-specialist port managers. The paper...

Port Master Plans and Feasibility Studies
Port projects are cost-intensive long-life irreversible assets, and developing countries particularly limping with resource constraints could not afford the luxury of short-sighted defective...

Gabon Mineral Port Planning
There has been increasing interest in the use of topping-off and top-loading vessel transport systems to ease the burden of expenditures for deepening harbors to fully load large vessels....

Design of Wharf Facilities, Guam, M.I., to Accommodate Difficult Site Conditions
A wharf facility currently under construction in Guam, Mariana Islands, for the U. S. Navy utilizes precast concrete box caisson construction to satisfy difficult site conditions. To reduce...

Soil Quality Testing in Ports: Why?
The Port of Seattle has instituted an agency-wide environmental protection guidelines which include the option to prepare site histories and perform chemical screening of soils prior to...

Port Planning after Earthquake Damage
The earthquake of March 1985 affected two important ports in Chile: Valparaiso and San Antonio. While emergency measures succeeded in solving immediate operational problems, there remain...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Terminal 18 Entry Facility?Port of Seattle
This paper presents a successful approach that was used in the planning, design, permit coordination, and expansion of the entry/exit facilities at Terminals 18 and 20 at the Port of Seattle....

Conversion of Keppel Wharves Conventional Berths 42 & 43 to Container Berths C13 and C14, Singapore
With further growth of container traffic expected in the 80's the need for additional facilities was apparent. Following an evaluation of available alternative sites, it was...

Port Expansion of Eastport, Maine
A recent pier expansion now allows Eastport to provide 40 feet of water at low tide. The pier expansion consists of a concrete-decked steel pipe pile-supported extension to an existing...

Carnation Terminal, Oakland?Preliminary Design
The Preliminary Design process is examined as it was applied to design of wharves for a new container terminal in the Port of Oakland, California. The process includes active interdisciplinary...

Designing Marinas to Mitigate Impacts
The John Wayne Marina was permitted for construction only after certain design features were altered to accomodate major biological and water quality concerns. The moorage basin was relocated...

 

 

 

 

Return to search