Causes and Preventions of Lamellar Tearing: Engineer's Notebook
Within the past 10 years, a steel cracking problem, lamellar tearing, has arisen after welding of thicker sections and higher-strength steels. A separation underlying a weld joining plate...

The LOOP Project: Taking the Ship to the Port
(1981 OCEA Award Winner.) LOOP�the Louisiana Offshore Oil Port�is a $700 million, multi-faceted project for the unloading of oil directly from...

Directional Wave Spectra Applications
These collected papers and their ensuing discussions presented at the September, 1981 symposium at the University of California on directional wave spectra applications examine the present...

Drilled Piers and Caissons
Drilled piers, also called drilled caissons, drilled shafts, bored piles, and cast-in-situ piles, have recently undergone a period of growth in their use as foundation bearing elements,...

Dynamic Response of Pile Foundations
Analytical Aspects
Recent developments in the analytical solutions and relevant measurements regarding pile foundations are examined. Pile foundations for both onshore and offshore structures are covered,...

Cognac: World's Tallest Offshore Oil Platform
Shell Oil's 1980 OCEA-winner is a three-sectioned design of steel fabrication and deep-sea installation. Cognac is currently the world's tallest, heaviest, and...

World's Tallest Offshore Platform Stands in 1025 Ft of Water
During the summer and fall of 1977 and 1978, Shell Oil installed the world's deepest drilling and production platform in water. Located in 1025-ft of water at the Cognac tract...

New York: Water City
New York's waterfront (some 584 miles) is its most impressive natural resource and its biggest management headache. In Manhattan, changes in waterfront technology (container...

California Soon to Have Platform in 850 Ft of Water
Exxon's oil drilling and production platform, to be placed off Santa Barbara, Calif. next July, will stand in water twice as deep�� 850 ft versus about 420 ft�� as any other...

Paul Bunyan Among Offshore Steel Structures
The world's two largest drydocks, the larger 1,150 x 800 ft in plan were used to assemble on land the four steel jackets. They now stand in the North Sea in about 400-ft of...

New Jack-Up Drill Rig Extends Their Range Into 375-Ft Water Depth
A new design of jack-up drill now building for the Gulf of Mexico extends from 250 ft to 375 ft, the depth of water in which they operate. Until now what limited their depth was their...

Condeep�In 400 Ft of Water, Concrete Caisson Requires No Piles
The Condeep structure consists of (1) 19 cylindrical tanks each 66-ft diam and 164-ft high that together will store up to 900,000 bbl of oil; (2) the extension upward 300-ft more of three...

Preview�1976 Offshore Technology Conference
In this Eighth Offshore Technology, the 300 papers and 1,300 exhibitors will be related to such topics as semi-submersible drill rigs, pollution avoidance devices, equipment protection,...

Pioneer Offshore LNG Terminal
Among the new offshore structures along the east coast of the United States is a terminal facility about one mile off Cove Point, Md., in Chesapeake Bay. This terminal will take deliver...

Earth Retention by Drilled Reinforced Concrete Caissons
A hillside fill is stabilized by the construction of drilled reinforced concrete caissons. The fill supports a building which houses equipment important to a manufacturing process. Other...

North Sea Oil-Water Mix
In the North Sea between Britian and Norway, giant structures are rising in one of the world's largest efforts to extract oil and gas offshore. An overview of the problems...

Report on Pipeline Location
This Report on Pipeline Location is devoted primarily to suggested procedures related to cross-country pipelines: reconnaissance, location,...

Design of Foundations for Control of Settlement
Proceedings of the conference held in Evanston, Illinois, June 16-19, 1964. Sponsored by the Soil Mechanics and Foundations Division of the American Society of Civil Engineers. Design...

 

 

 

 

Return to search