Valuable Design Insights Derived from Construction and Operation of Kinzua Dam
A number of design alternatives have surfaced during more than 17 years of operating experience at Kinzua Dam which should be useful in the design, construction, and operation of other...

Design Accuracy of Stormwater Detention Basins
While the stormwater detention basin is the most frequently used method for controlling runoff from developing areas in the United States, there appears to be no statement of the probable...

Evaluation of Two-Stage Outlet Hydraulics
A two-stage detention basin is an effective storm water management tool. This type of basin is designed to control two storm events and it will tend to perform better than a single-stage...

High Streamflow Behaviors in the Ohio River Basin
The intensity function, which describes the severity of the flood occurrences, is a critical factor in flood control and reservoir operation. It is found that the occurrence rates of high...

Realistic Hydrology for Basin Management
Several realistic yet simple methods to describe infiltration, soil moisture redistribution, aquifer recharge, canal seepage and stream-aquifer interaction in a river basin are presented...

Decreases in Runoff and Sediment Yield by Drainage
Runoff and sediment yield from three small agricultural watersheds were measured during four winter rainfall seasons. Following two rainfall seasons of data collection, a subsurface drainage...

Modeling Analysis for Management of Artificial Recharge
The objective of these groundwater and sediment modeling studies is to determine the net change in storage and potentiometric levels within the Bunker Hill Groundwater Basin resulting...

River Basin Management: Role of Hydraulics and Hydrology
One of the major Illinois rivers originates in a neighboring state. The main stem of the river was channelized about 65 years ago, and is considered to be a 'drainage ditch....

Development of the Rio De La Plata Hydrographic Basin
The rivers and climate of the basin are described. Available and developed hydropower sites are presented. The international consequences of various water management schemes are discussed....

Goals and Objectives in Design of Detention Outlets
Goals are the broad general purposes of the detention pond and its outlet works. A typical goal for a detention pond would be to help manage storm runoff so as to maintain historic conditions...

New Wastewater Process Cuts Plant Costs 60%
By combining the aerator and the clarifier into one basin, this new wastewater treatment process can slash capital costs up to 60% and operating and maintenance costs up to 45%. Raw sewage...

Natural Treatment Systems in Wastewater Treatment and Sludge Management
Criteria defining performance of natural wastewater treatment and sludge management systems are presented. Objectives of natural treatment systems are to help treat municipal wastewater...

Flood Routing Program
This is the fourth article in Civil Engineering�ASCE's computer series. A BASIC language program is presented for routing floods through storage reservoirs or detention basins...

Tarbela Dam�Problems Solved by Novel Concretes
While constructing the world's largest embankment dam, Tarbela in Pakistan, the designers and contractors faced unprecedented flow volumes and velocities, causing severe cavitation...

Polymerization of Concrete Fights Cavitation
The techniques and materials used for the repair of concrete are many and varied. The repair at Dworshak Dam utilized epoxy resins, dry pack mortar, fibrous concrete and a new technique,...

Three Towns: Three Different Solutions to Stormwater Control
That an engineer is a creative solver of people-problems was shown in Kentucky, where a consultant designed stormwater control systems in three towns�� and came up with three different...

Russia Redistributes River Flow
Large interbasin water-transfers are underway with several more scheduled in the Soviet Union, changing the direction of natural river flow. The overall plan is to expand agricultural...

Pueblo Dam - A Bureau of Reclamation First
Pueblo Dam, the first massive-head buttress dam in Bureau of Reclamation history, is nearing completion. Pueblo Dam is a feature of the Fryingpan-Arkansas Project in Colorado. The 23 buttresses...

Difficult Dam Problems�� Stilling Basin Redesign
A landslide of major proportions occurred during construction of Silver Jack Dam in western Colorado. This slide required relocation and redesign of the spillway conduit and basin. Hydraulic...

Ground Water Basin Management
The purpose of this manual, Ground Water Basin Management, is to focus attention upon one particular phase of the hydrologic cycleground water....

 

 

 

 

Return to search