The Council's Strategy for Improving Fish Passage
The Columbia River Basin Fish and Wildlife Program was developed by the Northwest Power Planning Council in 1982 and amended in 1984 and 1987. The program is likely the largest ongoing...

A Juvenile Fish Bypass Program at Columbia River Basin Projects
Hydroelectric development in the Pacific Northwest region has altered the natural flow of the Columbia River and its major tributary, the Snake River. This has proven to be detrimental...

Systems Analysis for Fisheries Protection and Mitigation at Corps of Engineers Columbia River Dams
Pacific Northwest anadromous salmon and steelhead that migrate to and from the ocean are greatly affected by the numerous Columbia and Snake River dams they have to pass, first downstream...

Power System Study to Determine Hydro Benefits
This paper discusses evaluation methodologies used by Stone & Webster to determine the power benefits for six potential hydropower projects at existing U. S. Army Corps of Engineers...

Reliable Operation of Hydro-Thermal Power Systems
The demonstrated model allows planners to account for both operating and shortage costs, subject to a constraint on the system failure rate. In addition, the optimal long-term operation...

Pumped Storage and Power System Operations
The 2100 megawatt Bath County pumped storage power station began commercial operation in December 1985 as a jointly-owned project of Virginia Electric and Power Company (Virginia Power)...

Operational Flexibility?A Precious Commodity
This discussion is about Operational Flexibility, as it applies to the generating resources of a large electricity system. The author discusses the situation at Ontario Hydro, operationally...

Determination of Values of Project Storage for Hydropower Scheduling
The Columbia River is characterized by multiple and sometimes conflicting uses, and its basin extends over many political jurisdictions. To balance pluralistic needs and authorities with...

Managing for Multiple Uses?Theory and Practice
One of the gratest challenges given to reservoir operators is to provide an operating regime that will accomplish the objectives for which the project was constructed. This is important...

Marketing Power in the Pacific Northwest
The marketing of power in the Pacific Northwest is a process intimately tied to the management of the Columbia River system. This paper describes the characteristics of the river and transmission...

Columbia River Treaty Perspectives
The Columbia River Treaty was signed in 1961 and ratified by the governments of Canada and the United States in 1964. The Treaty required British Columbia to construct three large storage...

Simulation of Irrigation and Reservoir Water Use
Computer simulation of irrigation water use and corresponding downstream reservoir operation has been developed for the Canyon Ferry Reservoir on the Missouri River in Southwestern Montana....

Hydropower Development of China's Yangtze River
The Yangtze has eight times the hydro potential of the Columbia River basin, currently the largest developed hydro system in the world. In order to pursue economic development through...

Hydrologic Dispatch Model for a Hydropower System
A hydrologic dispatch model was developed for an 11 plant, six reservoir hydroelectric system. The model incorporates load forecasting, system dispatching strategy, and database management...

Optimal Operation of the Savannah River System
This paper presents an application of a stochastic control method to the real time operation of the Savannah river system which includes three reservoirs and is expected to meet energy...

Hydrologic Studies for Dinkey Creek Hydro-Electric Project
The economic analysis and final design of the 120 MW hydro-electric development on Dinkey Creek, a tributary of the North Fork of the Kings River in the Central Valley of California, requires...

Estimating Streamflow Characteristics for Micro-hydro Sites in Northwestern Oregon
Assessing hydropower potential requires knowledge of the streamflow characteristics at prospective sites. Gaging stations are often unavailable. A method for estimating streamflow characteristics...

The Role of Headwater Benefits in Hydropower Planning
Headwater benefits are the power benefits that accure to owners of downstream hydroelectric plants as a result of the operation of headwater improvements. The retention of water in upstream...

The Effect of Sedimentation on Hydro-Developments
This paper will discuss two major impacts which are the hydro construction on natural stream sedimentation and the sedimentation related problems during hydro operation. The two types...

Dam Safety Emergency Action Plans?A TVA-State Responsibility
The Federal Guidelines for Dam Safety requires each dam owner to prepare and maintain emergency action plans (EAP) for each of structure. These plans are necessary (1) to identify problems...

 

 

 

 

Return to search