A Risk and Vulnerability Assessment Approach for Selecting Routes: Case Study of Hazardous Waste Transportation in Arizona
The study objective was to provide an approach to selecting routes to a proposed hazardous waste treatment and storage facility, based on a risk and vulnerability assessment. Probability...

Lessons Learned by the News Media
The paper summarizes a few things learned from the news media's experience in Hurricane Hugo and which they will try to do differently the next time. These include: simulcasting...

Reactivation of the Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) Facility
The Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) was run by the Environmental Protection Agency (EPA) from 1974 to 1988. This open-air tank was used to test...

Results from Selected Oil-Spill Response Research
Recent large oil spills from tankers have reaffirmed the need for continuing technology assessment and research to improve oil-spill response capabilities. The Minerals Management Service...

Phased Engineering Development and Multiple Agency Review of Public Safety Issues
Several Santa Barbara County agencies have key engineering review responsibilities for new development. The magnitude of issues raised and the level of engineering review required for...

Evaluation of Beach Erosion and Accretion Predictors
This paper examines the capability of simple criteria to predict whether a beach will erode or accrete by wave-induced cross-shore sand transport. Emphasis is on beach change of engineering...

Land Disposal Restrictions and Mixed Waste Management
The Land Disposal Restrictions, imposed by Congress in 1984 and implemented by the Environmental Protection Agency, impose constraints on the management of mixed waste. Except in very...

Planning Subsurface Storage-Transport Facilities for Combined Sewer Overflow Control in Cincinnati, Ohio
The wastewater collection system in the greater Cincinnati area includes a large area served by a combined sewer system. The combined sewer system drains to the Ohio River and several...

Assessment of Effects of a Water Supply Withdrawal on Downstream Flows for Anadromous Fish Reproduction
A BASIC computer model was developed to simulate reservoir operations in conjunction with a proposed water supply withdrawal. The model was used to assess the potential impacts of the...

Environmental Impacts of Drought in the Tennessee Valley
Beginning in June 1984, the Tennessee Valley region entered the most severe, extended period of drought since record keeping began in 1890. The historical annual average rainfall across...

High Level Radioactive Waste Management 1991
The proceedings of the second annual international conference on High Level Radioactive Waste Management, held on April 28 - May 3, 1991, Las Vegas, Nevada, provides information on the...

Pumped Storage Promise
With many utilities facing potential shortfalls in generating capacity, pumped storage hydro plants could be a key to meeting peak-period energy demand in the 1990s. Pumped storage plants...

A Case for Modernizing the Funding and Repayment of Regional Water/Power Projects
Several regional water/power projects authorized by Congress remain unfunded and therefore uncompleted year after year. In this paper examples of such uncompleted projects are examined....

A Water Budget Approach to Instream Flow Maintenance
Storage reallocation is a current issue at many Federal water storage facilities that have hydroelectric generation. Allocation of storage to support instream flows is one of the changes...

Pumped Storage, the Environment and Mitigation
The privately financed 1,000 MW Rocky Point Pumped Storage Project located in central Colorado, USA, will be one of the world's highest head, 2,350 feet (716 m), reversible...

Distribution and Grain Sizes of Deposited Reservoir Sediments, Seventy Years after Dam Construction
The Elwha and Glines Canyon Hydroelectric Projects are located on the Elwha River in the northwest portion of the Olympic Peninsula in Washington State. The Elwha Dam was completed in...

Mercury in Fish and Water in New Impoundments?A Review of the Literature
Evidence to date indicates that only one metal, mercury, systematically bioaccumulates to ecologically significant concentrations as a direct result of impoundment. This bioaccumulation...

Reviewing the Role of Hydropower in TVA Reservoir Operations
The Tennessee Valley Authority (TVA) has reviewed the long term operating priorities for its reservoir system to determine the appropriate role of water quality and recreation as compared...

EPRI's Pumped Storage Planning and Evaluation Guide
EPRI's Pumped Storage Planning and Evaluation Guide was published in 1990. The Guide provides step-by-step procedures to: (a) evaluate pumped-storage operation in a utility...

The Mt. Hope Waterpower Project
The Mt. Hope Waterpower Project is a 2000 megawatt, underground pumped-storage hydroelectric power project located on the site of an inactive iron mine in the township of Rockaway, New...

 

 

 

 

Return to search