Protection of a 700-GPM Municipal Well Field with a 10-GPM Barrier Well: An Update After 8 Years of Remediation
In December 1978, a municipal well field developed by the Town of Acton, Massachusetts was shut down because of contamination by 1,1-dichloroethylene. Chemicals and process wash water...
Dune Profiles Before and After Storm Events in Coastal Massachusetts
It is well known that short-term changes in dune profiles can have a major effect on the severity of storm damage to coastal areas. In light of this, the standardized methodology developed...
Quality Control and Quality Assurance Plan for Bridge Channel-Stability Assessments in Massachusetts
A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by...
Modeling the Tides of Massachusetts and Cape Cod Bays
A time-dependent, three-dimensional numerical modeling study of the tides of Massachusetts and Cape Code Bays, motivated by construction of a new sewage treatment plant and ocean outfall...
Execution and Evaluation of High Capacity Caisson Load Tests in Glacial Deposits
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped 'residuals' tanks. Contract documents called...
Major Public Transportation Investments as Development Projects: Old Colony Railroad
In 1988, the Massachusetts Executive Office of Transportation and construction (EOTC) developed a set of guidelines for traffic studies in conjunction with the state's environmental review...
Tide- and Wind-Driven Flushing of Boston Harbor, Massachusetts
The flushing of Boston Harbor, a shallow, tidally dominated embayment with little fresh water input, is investigated using a depth-averaged model. The modeled tidal currents exhibit strong...
Dredging Contaminated Sediments: A Monitoring Plan for Boston Harbor
Dredging and blasting will be conducted in Boston's Inner Harbor over approximately a one-year period during construction of the Third Harbor Tunnel. The silty organic surface sediments...
Pre-Compression of Concrete Breasting Dolphins Solves Construction Problem
A roll-on/roll-off ferry terminal was built in Quincy, Massachusetts in 1989 as part of a marine transportation system to support construction of the sewage treatment facilities proposed...
Crane Raise with Zero Downtime
Massachusetts Fort Authority (MPA) was faced with a dilemma. Its Conley Terminal tenants needed higher cranes but could not relinquish the cranes for more than a few days at a time. No...
Upgrading Today's Terminals for Tomorrow's Needs
This paper describes how a 1940's vintage, timber pile supported wharf is being modernized to serve post-Panamax ships: how the Massachusetts Port Authority (MASSPORT) is rebuilding their...
Historic Seawalls of the Boston Harbor, Massachusetts Region: Evolution, Construction and Repair
The earliest seawalls in the Boston region were of crib construction. Cobb cribs had an open framework and could readily be floated into position and sunk with rock from local sources....
Estimating Urban and Suburban Sewage Flows with Assistance of GIS Technology
The Massachusetts Water Resource Authority (MWRA), an agency created by the Massachusetts legislature to provide wholesale water and sewer services to the metropolitan Boston areea, is...
Cyclic Behavior of a Deepwater Normally Consolidated Clay
A comprehensive advanced laboratory testing program was undertaken to study the cyclic behavior of clays under various combinations of one-way and two-way cyclic loading. This work was...
Boston's City within a City
The Massachusetts Water Resource Authority's 11-year effort to clean up Boston Harbor is in full swing. The nerve center of the project is Deer Island, a 210 acre site that...
Building Beneath Boston
Up/down construction is a method in which a project's substructure and superstructure are simultaneously built. The substructure's wall, column and foundation...
Boston's Sewage Outfall
The centerpiece of the Boston Harbor cleanup plan will be the sewage plant on Deer Island, which will treat water from 43 municipalities in the Boston metro area�500 mgd to start. In order...
Integrating Water Conservation Into Water Supply Planning
Consideration of water demand reduction strategies is increasingly important in water resources planning. Although more research is needed to improve the reliability of water savings data,...
Recapturing Boston's Heritage
Structural upgrading of Boston's Old State House and Faneuil Hall is part of an extensive restoration project undertaken by the National Park Service at a cost of $10.6 million...
Geotechnical Database Management Systems for Boston's Central Artery/Harbor Tunnel Project
This paper presents a geotechnical computer application currently in use on Boston's Central Artery/Harbor Tunnel (CA/T) Project. The application is designed to manage subsurface...
Return to search