Structural Members and Connections Used in Foundations
This chapter specifies design procedures for steel members and connections embedded in concrete foundations or the earth. Additional design requirements for structural members and connections...

Scope
This standard guideline covers planning, design, pipe materials, and construction of microtunneling. The term microtunneling is defined as a trenchless construction method for installing...

Detailed Site Investigations
This section addresses site investigation issues that are important for detailed design and construction of microtunneling projects. These site investigations include the following: Geotechnical...

Contract Documents
As with any civil works project, the bid and contract documents prepared by the owner and the engineer should provide the contractor with the necessary information to prepare bids, to...

Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...

Measurement and Payment
The owner shall establish a bid schedule to obtain pricing for all work associated with the microtunneling installation. This bid schedule provides the bidders the opportunity to establish...

Notes on Heavy Lift Design
The interrelated activities and responsibilities of the various organizations involved in the lift design and offshore installation of topside facilities for an offshore platform are discussed....

Findings From a Joint Industry Study on Foundation Fixity of Jackup Units
During the design storm conditions the soil supporting jack-up unit footings may be close to, or at plastic failure. Accordingly, the use of elastic solutions to the problems of foundation...

Extreme Wave-Force Calculation Procedure for 20th Edition of API RP-2A
The paper describes the revised guideline design wave force calculation procedure approved for the 20th edition of the API-RP2A WSD and the first edition of the API-RP2A LRFD and contrasts...

A Simple Model to Predict Soil Resistance to Driving for Long Piles in Deepwater Normally Consolidated Clays
As the exploration and development for offshore oil and gas reserves moves into the deepwater environment of the continental slope, a good model is necessary to evaluate drivability of...

Application of Model Pile Tests to Axial Pile Design
Experiments conducted with instrumented model pile segment probes at Harvey and Empire, Louisiana are summarized and the observed behavior interpreted. Correlations are developed for the...

Case Study of Offshore Pile System Reliability
This paper presents the results of research effort to evaluate the reliability of offshore pile foundation systems. It is an extension of previous work by the authors [14] dealing with...

Reliability and Resilience � Essential Ingredients of Sustainable Geotechnics
Sustainability of a system is its ability to survive and retain its functionality over time. In very simple terms, sustainability deals with the capacities (resistances) and demands (loads)...

Asset Management of Earth Retaining Structures: Design through Design Life
Regarding new earth retaining structures (ERS) construction, the message is clear: plan for asset management. New construction is certainly not immune to performance issues, and the time...

The Transbay Transit Center: Breaking New Ground in Urban Geotechnics
A building boom centered around the construction of the new Transbay Transit Center (TTC) is transforming the South of Market neighborhood in downtown San Francisco, newly dubbed the Transbay...

Underpinning and Shoring of the Historic Howard Theatre in Washington, DC
The Howard Theatre was constructed in 1910 at 620 T Street, NW in Washington, DC. In 2010, a group of sponsoring organizations and developers put together a $17.1 million plan to revitalize...

Challenges and Risks of Jet Grouting in a Congested Urban Environment
In the heart of London, one of Europe's largest jet grouting contracts is nearing completion. The jet grouting is part of the overall 7-year-long upgrade project to London...

Support of Excavation Challenges and Solutions at a Manhattan Excavation Site
This article discusses the challenges and alternate solutions encountered in 2012 during support of excavation operations at a medical center project site in Manhattan, NY. The project...

Design-Build and Public-Private Partnerships: Risk Allocation of Subsurface Conditions
Project Owners, especially in the public sector, are exploring and utilizing alternative project delivery methods, such as design-build (D-B) and public-private partnerships (P3s). Some...

2013 OPAL Gala Award Videos
Introductions for ASCE's 2013 Outstanding Civil Engineering Achievement award finalists along with the acceptance speech of the winner, the Alvarado Water Treatment Plant....

 

 

 

 

Return to search